Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0023548
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 00. Application dictionarymajoralways2013-04-15 12:442013-04-19 12:52
ReporterVictorVillarView Statuspublic 
Assigned Todmiguelez 
PriorityurgentResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revisionfb7f413caad7
ProjectionnoneETAnoneTarget Version3.0MP23
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned Topramakrishnan
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0023548: The Costing Background process definiton should be different

DescriptionThe Costing Background process definiton should be different, it should be checked the 'Prevent Concurrent Executions' flag in order to avoid overalpping process and the cost calculation will be wrong
Steps To ReproduceAs System Admin role,
Go to Report and Process window,
  Open the Costing Background Process and realise that the 'Prevent Concurrent Executions' = No. It should be YES
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
related to defect 0023537 closedSandrahuguet The background processes included on referencedData are defined to be executed every minute. 
related to defect 0023561 closeddmiguelez When a Process is Defined as 'Prevent Concurrent Executions' allow to filter by Client and Organization for canceling one. 
blocks defect 00251423.0PR14Q2 closedAtulOpenbravo Concurrent Execution flag should work in a different way for Costing Background process 

-  Notes
(0057938)
hgbot (developer)
2013-04-16 19:15

Repository: erp/devel/pi
Changeset: fb7f413caad7d0259ecb6cc976d16acd6b6ea6a9
Author: David Miguelez <david.miguelez <at> openbravo.com>
Date: Tue Apr 16 18:23:36 2013 +0200
URL: http://code.openbravo.com/erp/devel/pi/rev/fb7f413caad7d0259ecb6cc976d16acd6b6ea6a9 [^]

Fixes Issue 23548: Defines Background Processes as Prevent Concurrent
Executions.

---
M src-db/database/sourcedata/AD_PROCESS.xml
---
(0058005)
pramakrishnan (developer)
2013-04-18 07:12

Code Review + Testing - OK.
(0058040)
hudsonbot (developer)
2013-04-19 12:52

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/872081925d42 [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2013-04-15 12:44 VictorVillar New Issue
2013-04-15 12:44 VictorVillar Assigned To => AugustoMauch
2013-04-15 12:44 VictorVillar Modules => Core
2013-04-15 12:44 VictorVillar Resolution time => 1368050400
2013-04-15 12:44 VictorVillar Triggers an Emergency Pack => No
2013-04-15 12:44 VictorVillar Issue Monitored: networkb
2013-04-15 12:49 AugustoMauch Relationship added related to 0023537
2013-04-15 12:51 AugustoMauch Assigned To AugustoMauch => dmiguelez
2013-04-16 18:13 dmiguelez Relationship added related to 0023561
2013-04-16 19:15 hgbot Checkin
2013-04-16 19:15 hgbot Note Added: 0057938
2013-04-16 19:15 hgbot Status new => resolved
2013-04-16 19:15 hgbot Resolution open => fixed
2013-04-16 19:15 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/fb7f413caad7d0259ecb6cc976d16acd6b6ea6a9 [^]
2013-04-18 07:12 pramakrishnan Review Assigned To => pramakrishnan
2013-04-18 07:12 pramakrishnan Note Added: 0058005
2013-04-18 07:12 pramakrishnan Status resolved => closed
2013-04-19 12:52 hudsonbot Checkin
2013-04-19 12:52 hudsonbot Note Added: 0058040
2013-11-13 11:32 VictorVillar Relationship added blocks 0025142


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker