ID
0006082
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 06. Material requirement planning (MRP)minorhave not tried2008-11-19 17:532009-04-24 16:56
ReporterRenateNieuwkoopView Statuspublic 
Assigned ToAinhoaPagola 
PrioritynormalResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revision11381
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseOracleJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0006082: Work Requirement generated by MRP mfg plan does not reflect conversion rate

DescriptionMaterial Requirement Planning (MRP) || Transactions || Manufacturing Plan || Header
Material Requirement Planning (MRP) || Transactions || Manufacturing Plan || Header

When Work Requirements get generated from the Manufacturing Plan (MRP), it does not reflect the conversion rate and process quantity (snapshot 02)
If you enter a Work Requirement manually (see snapshot 03) it will do that, based on the process plan (see snapshot 01).

The system generated work requirement is using the same process plan, so the conversion rate should be picked up from that and the process quantity should be filled out also.
Tagscomsup_sprint3
Attached Filesjpg file icon 191108Workrequirementissue01.jpg [^] (116,045 bytes) 2008-11-19 17:53


jpg file icon 191108Workrequirementissue02.jpg [^] (156,058 bytes) 2008-11-19 17:54


jpg file icon 191108Workrequirementissue03.jpg [^] (154,682 bytes) 2008-11-19 17:55

- Relationships Relation Graph ] Dependency Graph ]
depends on backport 0006170 closedmirurita Work Requirement generated by MRP mfg plan does not reflect conversion rate 

-  Notes
(0011050)
gorkaion (developer)
2008-12-09 12:22

Modify the Procedure MRP_WorkRequirement to include in the insert statement the secondaryqty, secondaryunit and conversionrate. Retrieve the values in the cursor as it is done with the explodephases column.

Take a look to SL_WorkRequirement_ProcessPLan and SL_WorkRequirement_Conversion callouts.
(0011534)
svnbot (reporter)
2008-12-18 17:26

Repository: openbravo
Revision: 11381
Author: AinhoaPagola
Date: 2008-12-18 17:26:10 +0100 (Thu, 18 Dec 2008)

Fixes bug 0006082. Work requirement generated by MRP reflects conversion rate.

---
U trunk/src-db/database/model/functions/MRP_WORKREQUIREMENT.xml
---

https://dev.openbravo.com/websvn/openbravo/?rev=11381&sc=1 [^]

- Issue History
Date Modified Username Field Change
2008-11-19 17:53 RenateNieuwkoop New Issue
2008-11-19 17:53 RenateNieuwkoop Assigned To => rafaroda
2008-11-19 17:53 RenateNieuwkoop sf_bug_id 0 => 2315248
2008-11-19 17:53 RenateNieuwkoop File Added: 191108Workrequirementissue01.jpg
2008-11-19 17:54 RenateNieuwkoop File Added: 191108Workrequirementissue02.jpg
2008-11-19 17:55 RenateNieuwkoop File Added: 191108Workrequirementissue03.jpg
2008-11-24 11:47 rafaroda Status new => scheduled
2008-11-24 11:47 rafaroda Assigned To rafaroda => gorkaion
2008-11-24 11:47 rafaroda fix_in_branch => trunk
2008-12-09 12:16 gorkaion Assigned To gorkaion => AinhoaPagola
2008-12-09 12:22 gorkaion Note Added: 0011050
2008-12-18 17:26 svnbot Checkin
2008-12-18 17:26 svnbot Note Added: 0011534
2008-12-18 17:26 svnbot Status scheduled => resolved
2008-12-18 17:26 svnbot Resolution open => fixed
2008-12-18 17:26 svnbot svn_revision => 11381
2008-12-19 10:36 AinhoaPagola Tag Attached: comsup_sprint3
2009-04-21 11:07 psarobe Status resolved => closed
2009-04-24 16:56 rafaroda version => pi
2009-04-24 16:56 rafaroda fix_in_branch pi =>


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker