0006082: Work Requirement generated by MRP mfg plan does not reflect conversion rate
Material Requirement Planning (MRP) || Transactions || Manufacturing Plan || Header
Material Requirement Planning (MRP) || Transactions || Manufacturing Plan || Header

When Work Requirements get generated from the Manufacturing Plan (MRP), it does not reflect the conversion rate and process quantity (snapshot 02)
If you enter a Work Requirement manually (see snapshot 03) it will do that, based on the process plan (see snapshot 01).

The system generated work requirement is using the same process plan, so the conversion rate should be picked up from that and the process quantity should be filled out also.
comsup_sprint3
depends on backport 0006170 closed mirurita Work Requirement generated by MRP mfg plan does not reflect conversion rate 
jpg 191108Workrequirementissue01.jpg (116,045) 2008-11-19 17:53
https://issues.openbravo.com/file_download.php?file_id=441&type=bug
jpg

jpg 191108Workrequirementissue02.jpg (156,058) 2008-11-19 17:54
https://issues.openbravo.com/file_download.php?file_id=442&type=bug
jpg

jpg 191108Workrequirementissue03.jpg (154,682) 2008-11-19 17:55
https://issues.openbravo.com/file_download.php?file_id=443&type=bug
jpg
Issue History
2008-11-19 17:53RenateNieuwkoopNew Issue
2008-11-19 17:53RenateNieuwkoopAssigned To => rafaroda
2008-11-19 17:53RenateNieuwkoopsf_bug_id0 => 2315248
2008-11-19 17:53RenateNieuwkoopFile Added: 191108Workrequirementissue01.jpg
2008-11-19 17:54RenateNieuwkoopFile Added: 191108Workrequirementissue02.jpg
2008-11-19 17:55RenateNieuwkoopFile Added: 191108Workrequirementissue03.jpg
2008-11-24 11:47rafarodaStatusnew => scheduled
2008-11-24 11:47rafarodaAssigned Torafaroda => gorkaion
2008-11-24 11:47rafarodafix_in_branch => trunk
2008-12-09 12:16gorkaionAssigned Togorkaion => AinhoaPagola
2008-12-09 12:22gorkaionNote Added: 0011050
2008-12-18 17:26svnbotCheckin
2008-12-18 17:26svnbotNote Added: 0011534
2008-12-18 17:26svnbotStatusscheduled => resolved
2008-12-18 17:26svnbotResolutionopen => fixed
2008-12-18 17:26svnbotsvn_revision => 11381
2008-12-19 10:36AinhoaPagolaTag Attached: comsup_sprint3
2009-04-21 11:07psarobeStatusresolved => closed
2009-04-24 16:56rafarodaversion => pi
2009-04-24 16:56rafarodafix_in_branchpi =>

Notes
(0011050)
gorkaion   
2008-12-09 12:22   
Modify the Procedure MRP_WorkRequirement to include in the insert statement the secondaryqty, secondaryunit and conversionrate. Retrieve the values in the cursor as it is done with the explodephases column.

Take a look to SL_WorkRequirement_ProcessPLan and SL_WorkRequirement_Conversion callouts.
(0011534)
svnbot   
2008-12-18 17:26   
Repository: openbravo
Revision: 11381
Author: AinhoaPagola
Date: 2008-12-18 17:26:10 +0100 (Thu, 18 Dec 2008)

Fixes bug 0006082. Work requirement generated by MRP reflects conversion rate.

---
U trunk/src-db/database/model/functions/MRP_WORKREQUIREMENT.xml
---

https://dev.openbravo.com/websvn/openbravo/?rev=11381&sc=1 [^]