Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||
ID | ||||||||
0005140 | ||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||
backport | [Openbravo ERP] 03. Procurement management | minor | always | 2008-09-22 11:08 | 2009-05-21 16:49 | |||
Reporter | RenateNieuwkoop | View Status | public | |||||
Assigned To | AinhoaPagola | |||||||
Priority | normal | Resolution | fixed | Fixed in Version | ||||
Status | closed | Fix in branch | pi | Fixed in SCM revision | 10836 | |||
Projection | none | ETA | none | Target Version | ||||
OS | Any | Database | Oracle | Java version | ||||
OS Version | Database version | Ant version | ||||||
Product Version | 2.40beta | SCM revision | ||||||
Merge Request Status | ||||||||
Review Assigned To | ||||||||
OBNetwork customer | No | |||||||
Web browser | ||||||||
Modules | Core | |||||||
Support ticket | ||||||||
Regression level | ||||||||
Regression date | ||||||||
Regression introduced in release | ||||||||
Regression introduced by commit | ||||||||
Triggers an Emergency Pack | No | |||||||
Summary | 0005140: Purchase Order created from Requisition does not take need-by date into account | |||||||
Description | Reload Current Page Procurement Management || Transactions || Purchase Order || Header >> Lines The Scheduled delivery date is not in line with: Procurement Management || Transactions || Requisition || Header >> Lines Need by date When you enter a Requisition with a need by date of next month and create a Purchase Order from it, the scheduled delivery date for the Purchase Order line is today's date | |||||||
Proposed Solution | Align the Scheduled Delivery date on the PO with the need by date on the requisition | |||||||
Tags | No tags attached. | |||||||
Attached Files | ||||||||
![]() |
|||||||||||||||
|
![]() |
|
(0010757) svnbot (viewer) 2008-11-27 10:44 |
Repository: openbravo Revision: 10658 Author: AinhoaPagola Date: 2008-11-27 10:44:06 +0100 (Thu, 27 Nov 2008) Fixes bug 0005140. Need by date taken into account in Manage Requisition. --- U branches/r2.40/src-db/database/model/functions/M_REQUISITION_CREATEPO.xml --- https://dev.openbravo.com/websvn/openbravo/?rev=10658&sc=1 [^] |
(0014076) sureshbabu (viewer) 2009-02-26 09:12 |
Still i can able to reproduce the issue in context http://79.125.56.185/openbravotrunk [^] Steps to reproduce: 1) Create a requisition by moving to Procurement Management || Transactions || Requisition || Header enter BP, 2) Move to line items select a product enter the qty and change the Need by date to one month after the current date. and move back to header and click complete button. 3) using Requisition to order option generate PO from Requisition. 4) Open the above created Po, you will find scheduled delivery date is equal to current date instead of date given in Need by date field in requisition. |
(0014077) sureshbabu (viewer) 2009-02-26 09:13 |
Still the issue exists, please find the details in the notes attached with this issue. |
(0014085) AinhoaPagola (viewer) 2009-02-26 09:45 |
Hello, There are two options to create PO from requisitions. If the PO is created by clicking in the button "create purchase order" in manage requisitions header window, a line is created for each of the lines in the requisition and the need by date will be maintained. The purchase orders header will have the minimum need by date as scheduled delivery date. This has being fixed in this issue as it was not like this before. The second option is the one you described. If the PO is created with the process "Requisition to Order" the lines are grouped by product into one single line that why it is not possible for them to maintain their need by date field for each line. At the moment todays date is assigned as Scheduled delivery date, but it could be requested that a more suitable date is assigned. This should be treated as a feature request. See the corresponding defect of this backport for more information. |
(0016438) sureshbabu (viewer) 2009-05-19 08:47 |
Fixed while the Po is created through Manage requisition option, closing the issue as per developers comments. |
![]() |
|||
Date Modified | Username | Field | Change |
2008-09-22 11:08 | cromero | New Issue | |
2008-09-22 11:08 | cromero | Assigned To | => gorkaion |
2008-09-22 11:08 | cromero | Status | new => scheduled |
2008-11-13 23:06 | rafaroda | Assigned To | gorkaion => AinhoaPagola |
2008-11-27 10:44 | svnbot | Checkin | |
2008-11-27 10:44 | svnbot | Note Added: 0010757 | |
2008-11-27 10:44 | svnbot | Status | scheduled => resolved |
2008-11-27 10:44 | svnbot | Resolution | open => fixed |
2008-11-27 10:44 | svnbot | svn_revision | => 10658 |
2008-12-02 12:04 | svnbot | Checkin | |
2008-12-02 12:04 | svnbot | Note Added: 0010874 | |
2008-12-02 12:04 | svnbot | svn_revision | 10658 => 10836 |
2009-02-02 15:54 | rafaroda | Note Deleted: 0010874 | |
2009-02-26 09:12 | sureshbabu | Note Added: 0014076 | |
2009-02-26 09:13 | sureshbabu | Status | resolved => new |
2009-02-26 09:13 | sureshbabu | Resolution | fixed => open |
2009-02-26 09:13 | sureshbabu | Note Added: 0014077 | |
2009-02-26 09:45 | AinhoaPagola | Note Added: 0014085 | |
2009-02-26 09:45 | AinhoaPagola | Status | new => scheduled |
2009-02-26 09:45 | AinhoaPagola | fix_in_branch | 2.40 => trunk |
2009-02-26 09:45 | AinhoaPagola | Status | scheduled => resolved |
2009-02-26 09:45 | AinhoaPagola | Resolution | open => fixed |
2009-05-19 08:47 | sureshbabu | Note Added: 0016438 | |
2009-05-21 16:49 | psarobe | Status | resolved => closed |
2009-06-05 09:57 | gmauleon | Relationship added | has duplicate 0009326 |