Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0031415
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 04. Warehouse managementmajoralways2015-11-10 12:312015-11-28 15:24
ReporterVictorVillarView Statuspublic 
Assigned Toaferraz 
PriorityurgentResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revision92d905a6c013
ProjectionnoneETAnoneTarget Version3.0PR16Q1
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned Todmiguelez
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0031415: The valued stock report is not taking into account the starting date of the costing rule

DescriptionThe valued stock report is not taking into account the starting date of the costing rule
Steps To ReproduceThe valued stock report is not taking into account the starting date of the costing rule. The user can mix the information between different costing algorithms.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
causes defect 00330023.0PR16Q3 closedaferraz Stock available previous to the validation of the costing rule is not shown in Valued Stock Report 

-  Notes
(0082379)
aferraz (manager)
2015-11-26 17:18

Test plan:

As F&B Admin:

- Run Valued Stock Report for today and any warehouse and currency.
  Realize result is the same as if you run the report without the fix.

- Create a new Costing Rule for España and validate it.
  Run Costing Background process.

- Run Valued Stock Report for today, any currency and any warehouse from España.
  Realize result is the same as if you run the report without the fix.
(0082417)
hgbot (developer)
2015-11-27 11:26

Repository: erp/devel/pi
Changeset: 92d905a6c0136818567a34ca50122348e64db2f1
Author: Alvaro Ferraz <alvaro.ferraz <at> openbravo.com>
Date: Thu Nov 26 17:08:45 2015 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/92d905a6c0136818567a34ca50122348e64db2f1 [^]

Fixes issue 31415: Valued Stock Report is not filtering by CR startingdate

The valued stock report was not taking into account the starting date of the costing rule.

---
M src/org/openbravo/erpCommon/ad_reports/ReportValuationStock.java
M src/org/openbravo/erpCommon/ad_reports/ReportValuationStock_data.xsql
M src/org/openbravo/erpCommon/utility/OBDateUtils.java
---
(0082418)
dmiguelez (developer)
2015-11-27 11:27

Code Review + Testing Ok
(0082449)
hudsonbot (developer)
2015-11-28 15:24

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/a30fd74371da [^]
Maturity status: Test

- Issue History
Date Modified Username Field Change
2015-11-10 12:31 VictorVillar New Issue
2015-11-10 12:31 VictorVillar Assigned To => dmiguelez
2015-11-10 12:31 VictorVillar Modules => Core
2015-11-10 12:31 VictorVillar Resolution time => 1449702000
2015-11-10 12:31 VictorVillar Triggers an Emergency Pack => No
2015-11-26 10:16 aferraz Assigned To dmiguelez => aferraz
2015-11-26 10:16 aferraz Status new => scheduled
2015-11-26 17:18 aferraz Note Added: 0082379
2015-11-27 11:26 hgbot Checkin
2015-11-27 11:26 hgbot Note Added: 0082417
2015-11-27 11:26 hgbot Status scheduled => resolved
2015-11-27 11:26 hgbot Resolution open => fixed
2015-11-27 11:26 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/92d905a6c0136818567a34ca50122348e64db2f1 [^]
2015-11-27 11:27 dmiguelez Review Assigned To => dmiguelez
2015-11-27 11:27 dmiguelez Note Added: 0082418
2015-11-27 11:27 dmiguelez Status resolved => closed
2015-11-28 15:24 hudsonbot Checkin
2015-11-28 15:24 hudsonbot Note Added: 0082449
2016-05-19 17:17 ngarcia Relationship added causes 0033002


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker