Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0029954
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 04. Warehouse managementminoralways2015-05-21 11:332017-09-28 09:54
ReporteraferrazView Statuspublic 
Assigned Toaferraz 
PrioritynormalResolutionduplicateFixed in Version3.0PR17Q4
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSLinux 64 bitDatabasePostgreSQLJava version1.6.0_18
OS VersionProfessional ApplianceDatabase version8.3.9Ant version1.7.1
Product VersionSCM revision 
Review Assigned Toaferraz
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0029954: NPE while creating a Production Plan in Bill of Materials Production

DescriptionNPE while creating a Production Plan in Bill of Materials Production
Steps To ReproduceAs F&B Admin:
- Create a product named Test.
  Check Bill of Materials = true
  Move to Bill of Materials tab.
  Add a new line with any product and quantity = 2
  Click on Verify BOM

- Create a Bill of Materials Production
  Move to Production Plan tab and create a record.
  Select Test product and set quantity = 1 and save

- Realize a NPE has been raised in log:
java.lang.NullPointerException at org.openbravo.erpCommon.ad_callouts.SL_ProductionPlan_WRPhase_Quantity.execute(SL_ProductionPlan_WRPhase_Quantity.java:47)
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
duplicate of defect 0036235 closedcollazoandy4 NPE in SL_ProductionPlan_WRPhase_Quantity callout when updating production quantity in Production Plan tab 

-  Notes
(0084617)
psanjuan (manager)
2016-03-01 12:58

Issue verified.
(0084622)
psanjuan (manager)
2016-03-01 14:00
edited on: 2016-03-01 14:01

Test Plan
As F&B Admin:
- Create a product named Test.
  Check Bill of Materials = true
  Move to Bill of Materials tab.
  Add a new line with any product and quantity = 2
  Click on Verify BOM

- Create a Bill of Materials Production
  Move to Production Plan tab and create a record.
  Select Test product and set quantity = 1 and save

- Realize no any error/warning is shown in the log.


Issue can be code reviewed and closed.


- Issue History
Date Modified Username Field Change
2015-05-21 11:33 aferraz New Issue
2015-05-21 11:33 aferraz Assigned To => Triage Finance
2015-05-21 11:33 aferraz Modules => Core
2015-05-21 11:33 aferraz Triggers an Emergency Pack => No
2015-05-21 11:41 aferraz Assigned To Triage Finance => aferraz
2015-05-21 16:15 aferraz Status new => scheduled
2016-03-01 12:58 psanjuan Note Added: 0084617
2016-03-01 14:00 psanjuan Note Added: 0084622
2016-03-01 14:01 psanjuan Note Edited: 0084622 View Revisions
2017-09-28 09:54 aferraz Review Assigned To => aferraz
2017-09-28 09:54 aferraz Relationship added duplicate of 0036235
2017-09-28 09:54 aferraz Status scheduled => closed
2017-09-28 09:54 aferraz Resolution open => duplicate
2017-09-28 09:54 aferraz Fixed in Version => 3.0PR17Q4


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker