Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||
ID | ||||||||
0002587 | ||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||
defect | [Openbravo ERP] 06. Material requirement planning (MRP) | minor | always | 2008-02-01 10:59 | 2008-06-12 09:43 | |||
Reporter | roklenardic | View Status | public | |||||
Assigned To | gorkaion | |||||||
Priority | normal | Resolution | fixed | Fixed in Version | 2.40alpha-r2 | |||
Status | closed | Fix in branch | Fixed in SCM revision | |||||
Projection | none | ETA | none | Target Version | ||||
OS | Any | Database | Any | Java version | ||||
OS Version | Database version | Ant version | ||||||
Product Version | SCM revision | |||||||
Merge Request Status | ||||||||
Review Assigned To | ||||||||
OBNetwork customer | No | |||||||
Web browser | ||||||||
Modules | Core | |||||||
Support ticket | ||||||||
Regression level | ||||||||
Regression date | ||||||||
Regression introduced in release | ||||||||
Regression introduced by commit | ||||||||
Triggers an Emergency Pack | No | |||||||
Summary | 0002587: MRP Planning Method Weighting | |||||||
Description | In the MRP > Setup > Planning Method window, Lines tab, there is a mandatory field called Weighting. This field has a default value zero which means that the planning method (Transaction type) being entered will be given 0 importance and will be completely ignored. This default value would much better be set to 1. Especially to a new user, not changing this default value will yield no results with MRP. OB 2.35mp1 | |||||||
Tags | No tags attached. | |||||||
Attached Files | ||||||||
![]() |
|
![]() |
|
(0006176) user71 2005-06-01 00:00 edited on: 2008-06-12 09:43 |
This bug was originally reported in SourceForge bug tracker and then migrated to Mantis. You can see the original bug report in: https://sourceforge.net/support/tracker.php?aid=1884287 [^] |
Copyright © 2000 - 2009 MantisBT Group |