Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0002587Openbravo ERP06. Material requirement planning (MRP)public2008-02-01 10:592008-06-12 09:43
roklenardic 
gorkaion 
normalminoralways
closedfixed 
5
 
2.40alpha-r2 
No
Core
No
0002587: MRP Planning Method Weighting
In the MRP > Setup > Planning Method window, Lines tab, there is a mandatory field called Weighting. This field has a default value zero which means that the planning method (Transaction type) being entered will be given 0 importance and will be completely ignored. This default value would much better be set to 1. Especially to a new user, not changing this default value will yield no results with MRP.

OB 2.35mp1
No tags attached.
Issue History

Notes
(0006176)
user71   
2005-06-01 00:00   
(edited on: 2008-06-12 09:43)
This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1884287 [^]