View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0021924
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 09. Financial managementcriticalalways2012-10-11 22:522012-10-14 14:03
ReporterpjuvaraView Statuspublic 
Assigned Todmiguelez 
PriorityimmediateResolutionunable to reproduceFixed in Version
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version3.0MP15.1SCM revision 
Merge Request Status
Review Assigned Toeduardo_Argal
OBNetwork customerOBPS
Web browser
ModulesCore
Support ticket
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0021924: Balance sheet does not work when dates are expressed in MM-DD-YYYY

DescriptionThis is a regression.

Customer upgraded production environment from MP12.1 to MP15.1. After upgrade, the Balance Sheet & P&L report does not work anymore.

The customer is located in the USA and has the system configured with date format MM-DD-YYYY.

When you submit the report with date for example 09-30-2012 (balance sheet as of 30-SEP-2012), all the figures in the balance sheet come out to zero.

The data is correct. If you run the report without specifying a date, it works (it correctly shows figures as of the end of the year) but if you specify a date it does not.

This was working in MP12.1 and it no longer works in MP15.1, so it is a regression.
Steps To ReproduceSet date format to MM-DD-YYYY.
Submit the balance sheet as of a particular date.
TagsCoworking
Attached Filespng file icon Openbravo - Trial Balance Report - Wrong.png [^] (137,987 bytes) 2012-10-13 03:49


png file icon Openbravo - Trial Balance Report-Correct.png [^] (140,298 bytes) 2012-10-13 03:50

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0053328)
pjuvara (viewer)
2012-10-13 03:49

The issue appears to be more complex than what originally reported.

If you run the Balance Sheet report as of 09-29-2012 (29 SEP 2012), it works fine (or at least it shows something); if you run it on 09-30-2012, it is empty.

The records in FACT_ACCT do not justify this behavior, so this is a reporting issue, not a data issue.

To validate what is going on, I run the Trial Balance in production. You can see in attachment two outputs, one from 01-SEP-2012 to 29-SEP-2012 (this is correct) and one from 01-SEP-2012 to 30-SEP-2012 (which does not return any data).

It is clear that for some reason the system interprets 30-SEP-2012 incorrectly when it is specified as 09-30-2012.

See screenshot attached.
(0053340)
eduardo_Argal (viewer)
2012-10-14 14:03

Unable to reproduce. It is working fine

- Issue History
Date Modified Username Field Change
2012-10-11 22:52 pjuvara New Issue
2012-10-11 22:52 pjuvara Assigned To => dmiguelez
2012-10-11 22:52 pjuvara Modules => Core
2012-10-11 22:52 pjuvara OBNetwork customer => Yes
2012-10-11 22:52 pjuvara Tag Attached: Coworking
2012-10-13 03:49 pjuvara Note Added: 0053328
2012-10-13 03:49 pjuvara File Added: Openbravo - Trial Balance Report - Wrong.png
2012-10-13 03:50 pjuvara File Added: Openbravo - Trial Balance Report-Correct.png
2012-10-14 14:03 eduardo_Argal Review Assigned To => eduardo_Argal
2012-10-14 14:03 eduardo_Argal Note Added: 0053340
2012-10-14 14:03 eduardo_Argal Status new => closed
2012-10-14 14:03 eduardo_Argal Resolution open => unable to reproduce