defect[Openbravo ERP] 06. Material requirement planning (MRP)majoralways2009-11-03 11:392011-09-27 16:25
ReportermensenjhView Statuspublic 
Assigned Tojonalegriaesarte 
PrioritynormalResolutionno change requiredFixed in Version
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSLinux 32 bitDatabasePostgreSQLJava version1.6.0_11
OS VersionrPath LinuxDatabase version8.3.5Ant version1.7.1
Product Version2.50MP8SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0011227: MRP does not create work req on the basis of min inventory

DescriptionInventory for product A is 0. Minimum inventory is 50. There is no forecast or sales order. When the production plan is run no work requirements are created. Only when a forecast or sales order is entered does the system take into account the minimum inventory requirements.
Proposed SolutionProduction plan should calculate work requirements based on minimum stock requirements. A minimum stock requirement should be handled as a forecast or sales requirement.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
related to defect 0011245 closedadrianromero Cannot process MRP Work Reqs and Material Reqs 
related to defect 00194363.0MP9 closedjecharri Manufacturing planning does not take into account safety stock as minimum requirement unless there is demand 

-  Notes
(0041321)
psarobe (manager)
2011-09-27 16:25

MRP does not create work req on the basis of min inventory --> It is working as intended, if you want to change the behaviour you should log a feature request.

- Issue History
Date Modified Username Field Change
2009-11-03 11:39 mensenjh New Issue
2009-11-03 11:39 mensenjh Assigned To => rafaroda
2009-11-04 15:01 mensenjh Issue Monitored: mensenjh
2009-11-05 06:06 rafaroda Relationship added related to 0011245
2010-02-11 18:13 rafaroda Assigned To rafaroda => adrianromero
2011-06-03 11:00 dalsasua Assigned To adrianromero => dalsasua
2011-07-20 18:11 dalsasua Assigned To dalsasua => jonalegriaesarte
2011-09-27 12:28 gorkaion Note Added: 0041314
2011-09-27 12:28 gorkaion Status new => closed
2011-09-27 12:28 gorkaion Resolution open => no change required
2011-09-27 16:24 psarobe Note Deleted: 0041314
2011-09-27 16:25 psarobe Note Added: 0041321