Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0002587
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 06. Material requirement planning (MRP)minoralways2008-02-01 10:592008-06-12 09:43
ReporterroklenardicView Statuspublic 
Assigned Togorkaion 
PrioritynormalResolutionfixedFixed in Version2.40alpha-r2
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Merge Request Status
Review Assigned To
OBNetwork customerNo
Web browser
ModulesCore
Support ticket
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0002587: MRP Planning Method Weighting

DescriptionIn the MRP > Setup > Planning Method window, Lines tab, there is a mandatory field called Weighting. This field has a default value zero which means that the planning method (Transaction type) being entered will be given 0 importance and will be completely ignored. This default value would much better be set to 1. Especially to a new user, not changing this default value will yield no results with MRP.

OB 2.35mp1
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0006176)
user71
2005-06-01 00:00
edited on: 2008-06-12 09:43

This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1884287 [^]

- Issue History
Date Modified Username Field Change


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker