Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0051227
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[POS2] POSmajoralways2022-12-22 10:302023-01-04 14:14
ReporteralostaleView Statuspublic 
Assigned TojavierRodriguez 
PriorityimmediateResolutionfixedFixed in Version23Q1
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Review Assigned To
Regression levelPre packaging ( pi )
Regression date2022-12-16
Regression introduced in releasepi
Regression introduced by commithttps://gitlab.com/openbravo/product/pmods/org.openbravo.pos2/-/commit/c6ebbe82cd5739a46ec64cfa3d2e6098067665bd [^]
Triggers an Emergency PackNo
Summary

0051227: cannot change master data refresh interval

DescriptionWhenever a masterdata refresh interval is tried to be changed, saving the record fails if the POS inactivity timeout is not set.
Steps To ReproduceIn an instance with retail sample data:
1. Log in as White Valley Admin
2. In Touchpoint Type, select any (ie. PS POS Terminal Type)
3. Try to set a different Full refresh period
  -> ERROR: saving failed
     NPE is openbravo.log
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
caused by feature request 0051052 closedjavierRodriguez Use the inactivity infrastructure to automatically close a ticket if the user did not interact with the POS for some time 

-  Notes
(0145159)
hgbot (developer)
2023-01-04 11:34

Merge Request created: https://gitlab.com/openbravo/product/pmods/org.openbravo.pos2/-/merge_requests/1439 [^]
(0145170)
hgbot (developer)
2023-01-04 14:14

Merge request merged: https://gitlab.com/openbravo/product/pmods/org.openbravo.pos2/-/merge_requests/1439 [^]
(0145171)
hgbot (developer)
2023-01-04 14:14

Directly closing issue as related merge request is already approved.

Repository: https://gitlab.com/openbravo/product/pmods/org.openbravo.pos2 [^]
Changeset: c07d9d904199fc5c19ccdc991460aae6b3ae8866
Author: Javier Rodríguez Regueiro <javier.rodriguez@openbravo.com>
Date: 04-01-2023 13:14:16
URL: https://gitlab.com/openbravo/product/pmods/org.openbravo.pos2/-/commit/c07d9d904199fc5c19ccdc991460aae6b3ae8866 [^]

Fixed ISSUE-51227: Verify current timeout and previous timeout are not null at the same time

---
M src/org/openbravo/pos2/event/TerminalTypeTicketTimeoutEventHandler.java
---

- Issue History
Date Modified Username Field Change
2022-12-22 10:30 alostale New Issue
2022-12-22 10:30 alostale Assigned To => Retail
2022-12-22 10:30 alostale Triggers an Emergency Pack => No
2022-12-22 10:31 alostale Regression level => Pre packaging ( pi )
2022-12-22 10:31 alostale Regression date => 2022-12-16
2022-12-22 10:31 alostale Regression introduced in release => pi
2022-12-22 10:31 alostale Regression introduced by commit => https://gitlab.com/openbravo/product/pmods/org.openbravo.pos2/-/commit/c6ebbe82cd5739a46ec64cfa3d2e6098067665bd [^]
2022-12-22 10:32 alostale Relationship added caused by 0051052
2022-12-22 12:05 javierRodriguez Assigned To Retail => javierRodriguez
2023-01-04 11:34 hgbot Note Added: 0145159
2023-01-04 14:14 hgbot Resolution open => fixed
2023-01-04 14:14 hgbot Status new => closed
2023-01-04 14:14 hgbot Note Added: 0145170
2023-01-04 14:14 hgbot Fixed in Version => 23Q1
2023-01-04 14:14 hgbot Note Added: 0145171


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker