Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||
ID | ||||||||
0003386 | ||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||
feature request | [Openbravo ERP] B. User interface | minor | always | 2007-09-05 13:43 | 2013-01-10 15:18 | |||
Reporter | plujan | View Status | public | |||||
Assigned To | rgoris | |||||||
Priority | normal | Resolution | open | Fixed in Version | ||||
Status | closed | Fix in branch | pi | Fixed in SCM revision | OB3 | |||
Projection | none | ETA | none | Target Version | ||||
OS | Any | Database | Any | Java version | ||||
OS Version | Database version | Ant version | ||||||
Product Version | SCM revision | |||||||
Review Assigned To | plujan | |||||||
Web browser | ||||||||
Modules | Core | |||||||
Regression level | ||||||||
Regression date | ||||||||
Regression introduced in release | ||||||||
Regression introduced by commit | ||||||||
Triggers an Emergency Pack | No | |||||||
Summary | 0003386: Dojo validation does not work for invalid dates | |||||||
Description | Description: In the whole application, every date selector has a problem with no valid dates. You can enter all combination of "valid" values: 1 to 31 for dates, 1 to 12 for months and 1 to 9999 for years. This has no sense since a "01-01-0001" is accepted as well as "31-12-9999". But there are also accepted "31-02-2007" and "31-10-2007" and so on. Additional data: Altough it is possible to manually input such dates, there are well interpreted by the calendar control which year dates are limited to 1971 and 2070. | |||||||
Tags | Clean-up, ReleaseCandidate | |||||||
Attached Files | WrongDates.png [^] (94,096 bytes) 2012-02-16 11:04
| |||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Notes | |
(0003908) dbaz (developer) 2008-04-23 19:14 edited on: 2008-06-12 09:26 |
Logged In: YES user_id=1500873 Originator: NO The objetive of the dojo date format is to verify that the field introduced has the correct spell (MM-DD-YYYY, YYYY:MM:DD or whatever). Check the coherence of the date should be a feature request because require a severe javascript logic |
(0003909) cromero (reporter) 2008-04-23 19:41 edited on: 2008-06-12 09:26 |
Logged In: YES user_id=1500614 Originator: NO It needs to be reviewed in a more wider way in order to admit validations for different calendars. Now we admit the Gregorian calendar, but all the validations available are not implemented in order to admit other calendars (Hebrew, Chinese, Persian, etc.). A project to localize the calendar should be necessary. |
(0006975) user71 2005-06-01 00:00 edited on: 2008-06-12 09:44 |
This bug was originally reported in SourceForge bug tracker and then migrated to Mantis. You can see the original bug report in: https://sourceforge.net/support/tracker.php?aid=1788394 [^] |
(0045166) rgoris (developer) 2012-02-15 19:24 |
Obsolete as per new forms in Openbravo 3. |
(0045176) plujan (manager) 2012-02-16 11:04 |
rgoris, this issue is not obsolete nor fixed. Please review attached image of a 3.0 MP7.2 |
(0055462) rgoris (developer) 2013-01-10 15:18 |
Dojo not relevant anymore. Close. |
Issue History | |||
Date Modified | Username | Field | Change |
2008-07-01 19:24 | pjuvara | Tag Attached: ReleaseCandidate | |
2008-07-01 19:24 | pjuvara | Status | new => acknowledged |
2008-11-16 07:44 | pjuvara | Assigned To | dbaz => pjuvara |
2008-11-16 08:39 | pjuvara | Tag Attached: Clean-up | |
2008-12-10 10:53 | pjuvara | Assigned To | pjuvara => rgoris |
2008-12-10 15:04 | rgoris | Relationship added | blocks 0006466 |
2012-02-15 19:23 | rgoris | Status | acknowledged => scheduled |
2012-02-15 19:23 | rgoris | fix_in_branch | => pi |
2012-02-15 19:24 | rgoris | Note Added: 0045166 | |
2012-02-15 19:24 | rgoris | Status | scheduled => resolved |
2012-02-15 19:24 | rgoris | Fixed in SCM revision | => OB3 |
2012-02-15 19:24 | rgoris | Resolution | open => fixed |
2012-02-15 19:24 | rgoris | Status | resolved => closed |
2012-02-16 11:04 | plujan | Note Added: 0045176 | |
2012-02-16 11:04 | plujan | Status | closed => new |
2012-02-16 11:04 | plujan | Resolution | fixed => open |
2012-02-16 11:04 | plujan | Issue Monitored: plujan | |
2012-02-16 11:04 | plujan | Issue End Monitor: plujan | |
2012-02-16 11:04 | plujan | File Added: WrongDates.png | |
2013-01-10 15:18 | rgoris | Review Assigned To | => plujan |
2013-01-10 15:18 | rgoris | Note Added: 0055462 | |
2013-01-10 15:18 | rgoris | Status | new => closed |
Copyright © 2000 - 2009 MantisBT Group |