View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0002523
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2008-01-17 10:232008-06-18 18:16
ReporterphaniView Statuspublic 
Assigned Togorkaion 
PrioritynormalResolutionno change requiredFixed in Version2.40alpha-r3
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0002523: correct dates are not being copied when version is copied

Description - create a process plan 'A' along with version, operations etc

 - create another process plan 'B' and hit copy version to copy the process plan 'A'

 - everything is copied except the dates. I have the Process plan A from Dec 1 2007 to Jan 31 2008.

Find the attachment for details
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0003046)
cromero (reporter)
2008-01-21 18:55
edited on: 2008-06-12 09:24

Logged In: YES
user_id=1500614
Originator: NO

The description of this bug is not specific enough . The information required for reproducing this bug is not in its description.
Please make sure to specify:
1) Complete problem description
2) Environment details (Openbravo version, database type and OS)
3) Specific steps on how to reproduce the problem.

For more information, pleas refer to: http://wiki.openbravo.com/wiki/index.php/Bug_Reporting_Guidelines [^]

Please, reopen this bug adding the required details.

Thank you.

The Openbravo Team
(0003047)
phani (reporter)
2008-01-28 08:05
edited on: 2008-06-12 09:24

Logged In: YES
user_id=1922293
Originator: YES

Hi,

the problem is when i try to copy a process plan from an existing one, i am unable to get the correct dates of the old process plan into the new process plan.

Steps:
1. create a new process plan (Plan B) and save it.
2. click 'copy version' and select an existing process plan, click OK.
3. in the new process plan(Plan B), goto the version tab.
4. notice the starting date and the ending date. They do not match w.r.t the process plan which you have copied(the already existing process plan)

P.S:: Please check the image along with this thread for clarity.

Environment:
Openbravo 2.35,
Oracle 10g XE,
Windows XP Professional Service Pack 2.
(0003048)
gorkaion (developer)
2008-06-04 13:58
edited on: 2008-06-12 09:24

Logged In: YES
user_id=1500690
Originator: NO

Hi phani999

This is not a bug, it is not intended to copy the dates of the original version as we must ensure that there are not different versions valid on the same dates.

Anyway, I have found a new bug around this that I'm going to report and fix now.

If you think that this is not the proper way to copy the versions you can insert a Feature Request and we could discuss it.

Gorka Ion.
(0006112)
user71
2005-06-01 00:00
edited on: 2008-06-12 09:43

This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1873537 [^]

- Issue History
Date Modified Username Field Change
2008-06-18 18:16 plujan Status resolved => closed