Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0022562
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 01. General setupmajoralways2012-12-13 11:302013-05-23 01:32
ReporterpsanjuanView Statuspublic 
Assigned Topramakrishnan 
PriorityurgentResolutionfixedFixed in Version
StatusclosedFix in branchpiFixed in SCM revision44f07dfabca9
ProjectionnoneETAnoneTarget Version
OSLinux 32 bitDatabaseOracleJava version1.6
OS VersionUbuntu 8.04.1Database version11.1.0.6.0Ant version1.7.0
Product VersionSCM revision 
Review Assigned Topramakrishnan
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0022562: The accounting dimension "Project" should be linked to the "Multiphase Project" window.

DescriptionThe accounting dimension "Project" should be linked to the "Multiphase Project" window instead of the "Service Project" window.

Service Project window is a hidden window do not used.
Steps To ReproduceN/A
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0058491)
hgbot (developer)
2013-05-07 17:02

Repository: erp/devel/pi
Changeset: 44f07dfabca950a203fe49b320cb77fb6a1de5f8
Author: David Miguelez <david.miguelez <at> openbravo.com>
Date: Mon May 06 11:20:40 2013 +0200
URL: http://code.openbravo.com/erp/devel/pi/rev/44f07dfabca950a203fe49b320cb77fb6a1de5f8 [^]

Fixes Issue 22562: Project now Links to what it is defined in
Application Dictionary by default.

---
M src-db/database/sourcedata/AD_TABLE.xml
M src/org/openbravo/erpCommon/utility/ReferencedLink.java
---
(0058492)
pramakrishnan (developer)
2013-05-07 17:04

Code Review + Testing - OK.
(0058775)
hudsonbot (developer)
2013-05-23 01:32

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/97c7f6256af7 [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2012-12-13 11:30 psanjuan New Issue
2012-12-13 11:30 psanjuan Assigned To => dmiguelez
2012-12-13 11:30 psanjuan Modules => Core
2012-12-13 11:30 psanjuan Triggers an Emergency Pack => No
2012-12-13 11:31 psanjuan Summary The accounting dimension "Project" should be related to the "Multiphase Project" window. => The accounting dimension "Project" should be linked to the "Multiphase Project" window.
2012-12-13 11:31 psanjuan Description Updated View Revisions
2013-04-29 06:21 pramakrishnan Assigned To dmiguelez => pramakrishnan
2013-04-29 06:21 pramakrishnan Status new => scheduled
2013-04-29 06:21 pramakrishnan fix_in_branch => pi
2013-05-07 17:02 hgbot Checkin
2013-05-07 17:02 hgbot Note Added: 0058491
2013-05-07 17:02 hgbot Status scheduled => resolved
2013-05-07 17:02 hgbot Resolution open => fixed
2013-05-07 17:02 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/44f07dfabca950a203fe49b320cb77fb6a1de5f8 [^]
2013-05-07 17:04 pramakrishnan Review Assigned To => pramakrishnan
2013-05-07 17:04 pramakrishnan Note Added: 0058492
2013-05-07 17:04 pramakrishnan Status resolved => closed
2013-05-23 01:32 hudsonbot Checkin
2013-05-23 01:32 hudsonbot Note Added: 0058775


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker