View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0022520
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Openbravo ERP] 05. Production managementminoralways2012-12-11 17:022012-12-12 09:18
ReporterVictorVillarView Statuspublic 
Assigned Todmiguelez 
PriorityhighResolutionopenFixed in Version
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0022520: It would be fine to deploy the list of materials which compose a consumed product (BOM) in a work effort

DescriptionExample
Top Level Product A
----- Consumed Product 12
----- Consumed Product 13
----- Consumed Product 14
----- Consumed Product BB (Sub BOM Product BB)
_____________________Cons Prod 24
_____________________Cons Prod 23
----- Consumed Product 17

There are two different Process Plans loaded Product A and Product BB.
In Process Plan/Work Requirement for Product A only Product BB is listed as consumed.
When a generating ‘Create Standards’ in the Work Effort, we would like to generate lines on the Product tab for the consumed Prod 24
and Prod 23 used to make Product BB.

 Process Plan BB is used in many Top level Process Plans, so when a Work Requirement is created and a Work Effort generated from it, the user would like to see all the components, including those of BB in the Work Effort. This would allow them to process and updated all related products at once saving time, versus entering two Work Requirements, one for the Top and one for the Sub, then a Work Effort for each.
Steps To ReproduceExample
Top Level Product A
----- Consumed Product 12
----- Consumed Product 13
----- Consumed Product 14
----- Consumed Product BB (Sub BOM Product BB)
_____________________Cons Prod 24
_____________________Cons Prod 23
----- Consumed Product 17

There are two different Process Plans loaded Product A and Product BB.
In Process Plan/Work Requirement for Product A only Product BB is listed as consumed.
When a generating ‘Create Standards’ in the Work Effort, we would like to generate lines on the Product tab for the consumed Prod 24
and Prod 23 used to make Product BB.

 Process Plan BB is used in many Top level Process Plans, so when a Work Requirement is created and a Work Effort generated from it, the user would like to see all the components, including those of BB in the Work Effort. This would allow them to process and updated all related products at once saving time, versus entering two Work Requirements, one for the Top and one for the Sub, then a Work Effort for each.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2012-12-11 17:02 VictorVillar New Issue
2012-12-11 17:02 VictorVillar Assigned To => dmiguelez
2012-12-11 17:02 VictorVillar Modules => Core
2012-12-11 17:02 VictorVillar Triggers an Emergency Pack => No
2012-12-11 17:02 VictorVillar Issue Monitored: networkb
2012-12-12 09:18 VictorVillar Description Updated View Revisions
2012-12-12 09:18 VictorVillar Steps to Reproduce Updated View Revisions