Summary | 0022520: It would be fine to deploy the list of materials which compose a consumed product (BOM) in a work effort | ||
Revision | 2012-12-12 09:18 by VictorVillar | ||
Description | Example Top Level Product A ----- Consumed Product 12 ----- Consumed Product 13 ----- Consumed Product 14 ----- Consumed Product BB (Sub BOM Product BB) _____________________Cons Prod 24 _____________________Cons Prod 23 ----- Consumed Product 17 There are two different Process Plans loaded Product A and Product BB. In Process Plan/Work Requirement for Product A only Product BB is listed as consumed. When a generating ‘Create Standards’ in the Work Effort, we would like to generate lines on the Product tab for the consumed Prod 24 and Prod 23 used to make Product BB. Process Plan BB is used in many Top level Process Plans, so when a Work Requirement is created and a Work Effort generated from it, the user would like to see all the components, including those of BB in the Work Effort. This would allow them to process and updated all related products at once saving time, versus entering two Work Requirements, one for the Top and one for the Sub, then a Work Effort for each. |
||
Revision | 2012-12-11 17:02 by VictorVillar | ||
Description | Example Top Level Product A ----- Consumed Product 12 ----- Consumed Product 13 ----- Consumed Product 14 ----- Consumed Product BB (Sub BOM Product BB) _____________________Cons Prod 24 _____________________Cons Prod 23 ----- Consumed Product 17 There are two different Process Plans loaded Product A and Product BB. In Process Plan/Work Requirement for Product A only Product BB is listed as consumed. When a generating ‘Create Standards’ in the Work Effort, we would like to generate lines on the Product tab for the consumed Prod 24 and Prod 23 used to make Product BB. |
Copyright © 2000 - 2009 MantisBT Group |