Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0002215
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2007-10-31 18:592008-06-12 09:43
Reporteruser71View Statuspublic 
Assigned Togorkaion 
PrioritynormalResolutionno change requiredFixed in Versionpi
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0002215: CreatNew Icon missing - Process Plan

DescriptionAfter successfully creating a new process plan, version and operation, I can assign a new I/O Product but not a new Employee, Machine or Indirect Cost as there is not a CreateNew icon on the tool bar.

Openbravo 2.33
Windows Server 2003
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0002569)
gorkaion (developer)
2007-11-02 12:32
edited on: 2008-06-12 09:22

Logged In: YES
user_id=1500690
Originator: NO

That is not a bug.

The employees, machines and indirect costs have to be filled in the correspondent Cost Center. The Cost center is set in the operation defined in the operation tab.

Those tabs are filled when is calculated the standard cost.
(0005804)
user71
2005-06-01 00:00
edited on: 2008-06-12 09:43

This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1823619 [^]

- Issue History
Date Modified Username Field Change


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker