Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0012371
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Mantis @ OB] OthersminorN/A2010-02-22 08:362010-02-22 08:36
ReporteralostaleView Statuspublic 
Assigned To 
PrioritynormalResolutionopen 
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnone 
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Review Assigned To
Summary

0012371: Change priority when scheduling an issue

DescriptionDuring the triage process a typical flow is:
1. Take a new issue.
2. Assign it to a developer to fix it.
3. Create backport if needed.
4. Change its priority if needed.
5. Set it as scheduled.

By clicking the schedule button, it is possible to perform steps 2, 3 and 5; but if it priority is needed to be changed, it is necessary to edit the the issue.

It would be nice to add the priority dropdown list to the window that appears when scheduling.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2010-02-22 08:36 alostale New Issue


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker