Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||||||
ID | ||||||||||||
0012371 | ||||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||||||
feature request | [Mantis @ OB] Others | minor | N/A | 2010-02-22 08:36 | 2010-02-22 08:36 | |||||||
Reporter | alostale | View Status | public | |||||||||
Assigned To | ||||||||||||
Priority | normal | Resolution | open | |||||||||
Status | new | Fix in branch | Fixed in SCM revision | |||||||||
Projection | none | ETA | none | |||||||||
OS | Any | Database | Any | Java version | ||||||||
OS Version | Database version | Ant version | ||||||||||
Review Assigned To | ||||||||||||
Summary | 0012371: Change priority when scheduling an issue | |||||||||||
Description | During the triage process a typical flow is: 1. Take a new issue. 2. Assign it to a developer to fix it. 3. Create backport if needed. 4. Change its priority if needed. 5. Set it as scheduled. By clicking the schedule button, it is possible to perform steps 2, 3 and 5; but if it priority is needed to be changed, it is necessary to edit the the issue. It would be nice to add the priority dropdown list to the window that appears when scheduling. | |||||||||||
Tags | No tags attached. | |||||||||||
Attached Files | ||||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Issue History | |||
Date Modified | Username | Field | Change |
2010-02-22 08:36 | alostale | New Issue |
Copyright © 2000 - 2009 MantisBT Group |