Openbravo Issue Tracking System - Mantis @ OB
View Issue Details
0012371Mantis @ OBOtherspublic2010-02-22 08:362010-02-22 08:36
alostale 
 
normalminorN/A
newopen 
5
0012371: Change priority when scheduling an issue
During the triage process a typical flow is:
1. Take a new issue.
2. Assign it to a developer to fix it.
3. Create backport if needed.
4. Change its priority if needed.
5. Set it as scheduled.

By clicking the schedule button, it is possible to perform steps 2, 3 and 5; but if it priority is needed to be changed, it is necessary to edit the the issue.

It would be nice to add the priority dropdown list to the window that appears when scheduling.
No tags attached.
Issue History
2010-02-22 08:36alostaleNew Issue

There are no notes attached to this issue.