Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0012337
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2010-02-18 12:252010-03-16 00:00
ReporternetworkbView Statuspublic 
Assigned Toadrianromero 
PriorityhighResolutionfixedFixed in Version
StatusclosedFix in branchpiFixed in SCM revisionca99fd5a20ba
ProjectionnoneETAnoneTarget Version2.50MP14
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version2.50MP11SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0012337: Work Effort >> Production Run >> Product. The Order UOM doesn't appear.

DescriptionApply solution for 11829

Work Effort >> Production Run >> Product. The Order UOM doesn't appear.
Steps To ReproduceApply solution for 11829

-As Openbravo Admin go to Master Data Management || Product Setup || Unit of Measure.
-Create a new record:
    - EDI Code: Mg
    - Name: Miligramos
-Save, search the UOM: Unit and go to Conversion.
-Create a new record:
    - To UOM: Miligramos.
    - Multiplate rate by: 1
    - Divide rate by: 1
-Save and go to Master Data Management || Product, choose Block of Wood.
    - UOM: Miligramos
-Save and go to Product >> UOM.
    - UOM: Unit
-Save and go to Production Management || Transactions || Process Plan
-Create a new record, save and go to Version.
-Create a new record:
    - Starting Date: 01-01-2010
    - Ending Date: 01-01-2012
-Save and go to Operation.
-Create a new record, save, and go to I/O Products.
-Create a new record:
    - Product: Wooden back
    - Production Type: P-
-Save and create a new record:
    - Product: Block of Wood
    - Production Type: P+
    - Order UOM: Unit.
-Save and go to Production Management || Transactions || Work Requirement
-Create a new record:
    - Process Plan: 'Process Plan created'
    - WR Creation Date: 18-02-2010
    - Starting Date: 18-02-2010
- Click Process Work Requirement
-Go to Production Management || Transactions || Work Effort
-Create a new record:
    - Movement Date: 18-02-2010
- Save and go to Production Run,
-Create a new record:
    - WR Phase: select the WR Phase processed.
-Click Create Standards.
-Go to Product.
-Choose the P+ created.
-Realize that the Order UOM doesn't appear.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
related to defect 00118292.50MP12 closedrafaroda In Process Plan, I/O product, does not calculate properly UOM 

-  Notes
(0025261)
hgbot (developer)
2010-03-12 08:41

Repository: erp/devel/pi
Changeset: ca99fd5a20ba7ebc7e184bfaab6a1f59249324be
Author: Sivaraman Rajagopal <sivaraman.rajagopal <at> openbravo.com>
Date: Fri Mar 12 13:16:34 2010 +0530
URL: http://code.openbravo.com/erp/devel/pi/rev/ca99fd5a20ba7ebc7e184bfaab6a1f59249324be [^]

Fixes issue 12337: Work Effort >> Production Run >> Product. The Order UOM doesn't appear.

---
M src-db/database/model/functions/MA_PRODUCTIONRUN_STANDARD.xml
---
(0025263)
sivaraman (reporter)
2010-03-12 08:50

Steps to reproduce

1. Log on to Openbravo
2. Change role to Openbravo Admin
3. Go to Master Data Management || Product Setup || Unit of Measure
4. Create a new record with the following details
    EDI Code: Mg
    Name: Miligramos
5. Save and Search for Unit. Open it and go to Conversion.
6. Create a new record as follows:
    To UOM: Miligramos.
    Multiplate rate by: 1
    Divide rate by: 1
7. Save and go to Master Data Management || Product, choose Block of Wood.
8. Change UOM: Miligramos
9. Save and go to Product >> UOM.
10. Create UOM: Unit
11. Save and go to Production Management || Transactions || Process Plan
12. Create a new record, save and go to Version.
13. Create a new record:
    Starting Date: 01-01-2010
    Ending Date: 01-01-2012
14. Save and go to Operation.
15. Create a new record, save, and go to I/O Products.
16. Create a new record:
    Product: Wooden back
    Production Type: P-
17. Save and create a new record:
    Product: Block of Wood
    Production Type: P+
    Order UOM: Unit.
    Order quantity: 10
18. Save and go to Production Management || Transactions || Work Requirement
19. Create a new record:
    Process Plan: 'Process Plan created'
    WR Creation Date: 18-02-2010
    Starting Date: 18-02-2010
20. Click Process Work Requirement
21. Go to Production Management || Transactions || Work Effort
22. Create a new record with below details:
    Movement Date: 18-02-2010
23. Save and go to Production Run,
24. Create a new record as below:
25. WR Phase: select the WR Phase processed.
26. Click Create Standards.
27. Go to Product.
28. Choose the P+ created.
(0025433)
hudsonbot (developer)
2010-03-12 22:41

A changeset related to this issue has been promoted to main after passing a series of tests and an OBX has been generated:

Changeset: http://code.openbravo.com/erp/devel/main/rev/ca99fd5a20ba [^]
Merge Changeset: http://code.openbravo.com/erp/devel/main/rev/631c626866c1 [^]
Tests: http://builds.openbravo.com/view/devel-int/ [^]
OBX: http://builds.openbravo.com/erp/core/obx/OpenbravoERP-2.50CI.16685.obx [^]
(0025441)
arunkumar (reporter)
2010-03-15 08:06

Tested & Working fine

- Issue History
Date Modified Username Field Change
2010-02-18 12:25 networkb New Issue
2010-02-18 12:25 networkb Assigned To => adrianromero
2010-02-18 16:03 adrianromero Relationship added related to 0011829
2010-02-18 16:04 adrianromero Status new => scheduled
2010-02-18 16:04 adrianromero fix_in_branch => pi
2010-03-08 16:06 jpabloae Target Version 2.50MP13 => 2.50MP14
2010-03-12 08:41 hgbot Checkin
2010-03-12 08:41 hgbot Note Added: 0025261
2010-03-12 08:41 hgbot Status scheduled => resolved
2010-03-12 08:41 hgbot Resolution open => fixed
2010-03-12 08:41 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/ca99fd5a20ba7ebc7e184bfaab6a1f59249324be [^]
2010-03-12 08:50 sivaraman Note Added: 0025263
2010-03-12 22:41 hudsonbot Checkin
2010-03-12 22:41 hudsonbot Note Added: 0025433
2010-03-15 08:06 arunkumar Note Added: 0025441
2010-03-15 08:06 arunkumar Status resolved => closed
2010-03-16 00:00 anonymous sf_bug_id 0 => 2970930


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker