Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0011839
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 08. Project and service managementmajoralways2009-12-22 10:312011-09-15 22:52
Reporterpiecal_BEView Statuspublic 
Assigned Tojonalegriaesarte 
PrioritynormalResolutionno change requiredFixed in Version
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version1.6.0
OS VersionDatabase versionAnt version1.7.1
Product Version2.50MP9SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0011839: Project task price not calculated for BOM products

DescriptionIn a Multiphase project, when selecting a product for a product task, the price of that product is determined through a callout.

This callout only takes into account pricing of "simple" (non-BOM) products. When selecting a BOM-product the price is always 0.
Steps To Reproduce- Create a BOM Product (e.g. bicycle) consisting of multiple products (e.g. wheel, saddle)
- Set the price for the child products (in our example wheel 5 & saddle 10).
- Set the price of the bicycle to 0)
- Make sure the BOM is verified by running the "verifiy BOM" process

- Create a multiphase project and set the pricelist used for the products
- create a project phase
- create a project task
- select the product "bicycle"

Expected results
- The unit price of the bicycle is set to 20 (2 wheels at 20 and 1 saddle at 10)

Actual result
- The unit price of the bicycle is set to 0
Proposed SolutionSee attached patch file
TagsNo tags attached.
Attached Filespatch file icon patchProductTaskPrice.patch [^] (2,463 bytes) 2009-12-22 10:31 [Show Content]

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0040982)
psarobe (manager)
2011-09-15 22:52
edited on: 2011-09-15 22:53

This is the intended behaviour. The price of BOM is not calculated but the one defined so in this case zero


- Issue History
Date Modified Username Field Change
2009-12-22 10:31 piecal_BE New Issue
2009-12-22 10:31 piecal_BE Assigned To => rafaroda
2009-12-22 10:31 piecal_BE File Added: patchProductTaskPrice.patch
2010-02-11 17:55 rafaroda Assigned To rafaroda => adrianromero
2011-06-03 11:00 dalsasua Assigned To adrianromero => dalsasua
2011-07-20 18:11 dalsasua Assigned To dalsasua => jonalegriaesarte
2011-09-15 22:52 psarobe Note Added: 0040982
2011-09-15 22:52 psarobe Status new => closed
2011-09-15 22:52 psarobe Resolution open => no change required
2011-09-15 22:53 psarobe Note Edited: 0040982 View Revisions


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker