Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||||||
ID | ||||||||||||
0008480 | ||||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||||||
feature request | [Openbravo ERP] 06. Material requirement planning (MRP) | major | have not tried | 2009-04-07 11:17 | 2009-04-07 11:17 | |||||||
Reporter | pmagnin | View Status | public | |||||||||
Assigned To | gorkaion | |||||||||||
Priority | normal | Resolution | open | Fixed in Version | ||||||||
Status | new | Fix in branch | Fixed in SCM revision | |||||||||
Projection | none | ETA | none | Target Version | pi | |||||||
OS | Any | Database | Any | Java version | ||||||||
OS Version | Database version | Ant version | ||||||||||
Product Version | pi | SCM revision | ||||||||||
Review Assigned To | ||||||||||||
Web browser | ||||||||||||
Modules | Core | |||||||||||
Regression level | ||||||||||||
Regression date | ||||||||||||
Regression introduced in release | ||||||||||||
Regression introduced by commit | ||||||||||||
Triggers an Emergency Pack | No | |||||||||||
Summary | 0008480: MRP process : No control based on the dates | |||||||||||
Description | MRP Control Risks Report: The MRP does not provide any control based on the dates. The MRP process (based on Purchasing or Manufacturing plan) is only calculating the theoretical planned date. You have to check after the calculation if the provided planned date is not previous of the current day, or at least, belongs to the Safety lead time. For example, if you have a Safety lead time of 5 days and the MRP process provides a Purchase Planned Date for 2 days before the current date, you still have a security of 3 days. The Plan could be accepted, even if the start date in anterior. If the Purchase Planned Date is proposed for 6 days before, the manufacture process is impossible. All these informations should be easily available. We would need a MRP Report that gives you the Plans with Risks (High and Medium as regard the Safety lead Time, the current date and the estimated start date for the MRP). | |||||||||||
Tags | No tags attached. | |||||||||||
Attached Files | ||||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Issue History | |||
Date Modified | Username | Field | Change |
2009-04-07 11:17 | pmagnin | New Issue | |
2009-04-07 11:17 | pmagnin | Assigned To | => gorkaion |
2009-04-07 11:17 | pmagnin | Regression testing | => No |
Copyright © 2000 - 2009 MantisBT Group |