Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||
ID | ||||||||
0037317 | ||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||
defect | [Openbravo ERP] 04. Warehouse management | major | always | 2017-11-17 09:53 | 2018-01-03 12:39 | |||
Reporter | ngarcia | View Status | public | |||||
Assigned To | nonofrancisco | |||||||
Priority | urgent | Resolution | fixed | Fixed in Version | 3.0PR18Q1 | |||
Status | closed | Fix in branch | Fixed in SCM revision | 4206e68ea96b | ||||
Projection | none | ETA | none | Target Version | ||||
OS | Any | Database | Any | Java version | ||||
OS Version | Database version | Ant version | ||||||
Product Version | SCM revision | |||||||
Merge Request Status | ||||||||
Review Assigned To | dmiguelez | |||||||
OBNetwork customer | OBPS | |||||||
Web browser | ||||||||
Modules | Core | |||||||
Support ticket | 49514 | |||||||
Regression level | ||||||||
Regression date | ||||||||
Regression introduced in release | ||||||||
Regression introduced by commit | ||||||||
Triggers an Emergency Pack | No | |||||||
Summary | 0037317: Costing Background Process stopped if the same product is produced and consumed in different production run of same work effort | |||||||
Description | Costing Background Process stopped if the same product is produced and consumed in different production run of same work effort | |||||||
Steps To Reproduce | As group admin role: Create three products and set them as Production: RawMaterial WIP Final Set a Storage Bin for WIP and Final Add a purchase price list to RawMaterial and increase its stock Create a Manufacturing Cost Center and version Create an Activity and assign the previous Cost Center Create a Process Plan and Version Add two Operations to it Set RawMaterial as P- and WIP as P+ in first operation Set WIP as P- and Final as P+ in second operation Create a Work Requirement and process it Create a Work Effort Add two Production Run to it, one for each operation and set Completed Quantity Create Standards for both of them Validate it Launch the Costing Background Process and check the following error message is shown: java.lang.IllegalStateException: org.postgresql.util.PSQLException: ERROR: No average cost found for given product and date. Product: WIP, Date:... | |||||||
Tags | No tags attached. | |||||||
Attached Files | ![]() | |||||||
![]() |
|
![]() |
|
(0100706) nonofrancisco (viewer) 2017-11-24 14:59 |
As group admin role: * Create three products and set them as Production: RawMaterial WIP Final Set a Storage Bin for WIP and Final * Add a purchase price list to RawMaterial with price 3.00 * Create and complete a Goods Receipt for 5 units of product Raw Material * Create a Manufacturing Cost Center and version * Create an Activity and assign the previous Cost Center * Create a Process Plan and Version Add two Operations to it Set RawMaterial as P- and WIP as P+ in first operation Set WIP as P- and Final as P+ in second operation * Create a Work Requirement and process it * Create a Work Effort Add two Production Run to it, one for each operation Set Completed Quantity Create Standards for both of them * Validate the Work Effort * Launch the Costing Background Process * Verify the process completes successfully * Select Costing tab of product RawMaterial and verify: Cost: 3.24 Quantity: 5 Total Stock Valuation: 16.2 * Select Costing tab of product WIP and verify there is a line with: Cost: 3.24 Quantity: 1 Total Stock Valuation: 3.24 * Select Costing tab of product Final and verify: Cost: 3.24 Quantity: 1 Total Stock Valuation: 3.24 |
(0100830) dmiguelez (viewer) 2017-11-30 12:34 edited on: 2017-11-30 12:36 |
As group admin role: * Create three products and set them as Production: RawMaterial WIP Final Set a Storage Bin for WIP and Final * Add a purchase price list to RawMaterial with price 10.00 * Create and complete a Goods Receipt for 10 units of product Raw Material * Create a Manufacturing Cost Center and version * Create an Activity and assign the previous Cost Center * Create a Process Plan and Version Add two Operations to it Set RawMaterial as P- (2 units) and WIP as P+ (1 unit) in first operation Set WIP as P- (2 units) and Final as P+ (1 unit) in second operation * Create a Work Requirement and process it * Create a Work Effort Add two Production Run to it, one for each operation Set Completed Quantity (2 in the first case, 1 in the second) Create Standards for both of them * Validate the Work Effort * Launch the Costing Background Process * Verify the process completes successfully * Select Costing tab of product RawMaterial and verify: Cost: 10 Quantity: 10 Total Stock Valuation: 100 * Select Costing tab of product WIP and verify there is a line with: Cost: 20 Quantity: 2 Total Stock Valuation: 40 * Also, there should be another line, with same starting date and ending date, with no Production related to it and with Organization different from *. This is because this cost has been calculated with the old costing engine code. * Select Costing tab of product Final and verify: Cost: 40 Quantity: 1 Total Stock Valuation: 40 |
(0100831) dmiguelez (viewer) 2017-11-30 12:38 |
As group admin role: * Create four products and set them as Production: RawMaterial WIP1 WIP2 Final Set a Storage Bin for WIP and Final * Add a purchase price list to RawMaterial with price 10.00 * Create and complete a Goods Receipt for 10 units of product Raw Material * Create a Manufacturing Cost Center and version * Create an Activity and assign the previous Cost Center * Create a Process Plan and Version Add two Operations to it Set RawMaterial as P- (1 unit) and WIP1 as P+ (1 unit) in first operation Set WIP1 as P- (1 unit) and WIP2 as P+ (1 unit) in second operation Set WIP2 as P- (1 unit) and Final as P+ (1 unit) in second operation * Create a Work Requirement and process it * Create a Work Effort Add three Production Run to it, one for each operation Set Completed Quantity Create Standards for both of them * Validate the Work Effort * Launch the Costing Background Process * Verify the process completes successfully * Select Costing tab of product RawMaterial and verify: Cost: 10 Quantity: 10 Total Stock Valuation: 100 * Select Costing tab of product WIP1 and verify there is a line with: Cost: 10 Quantity: 1 Total Stock Valuation: 10 * Also, there should be another line, with same starting date and ending date, with no Production related to it and with Organization different from *. This is because this cost has been calculated with the old costing engine code. * Select Costing tab of product WIP2 and verify there is a line with: Cost: 10 Quantity: 1 Total Stock Valuation: 10 * Also, there should be another line, with same starting date and ending date, with no Production related to it and with Organization different from *. This is because this cost has been calculated with the old costing engine code. * Select Costing tab of product Final and verify: Cost: 10 Quantity: 1 Total Stock Valuation: 10 |
(0100832) hgbot (developer) 2017-11-30 12:44 |
Repository: erp/devel/pi Changeset: 4206e68ea96bcf6136b62a052c87895fcbd5905f Author: Nono Carballo <nonofce <at> gmail.com> Date: Thu Nov 30 10:44:40 2017 +0100 URL: http://code.openbravo.com/erp/devel/pi/rev/4206e68ea96bcf6136b62a052c87895fcbd5905f [^] Fixes issue 37317: Costing Background Process stopped if the same product is produced and consumed in different production run of same work effort If the product is not consumed by the same work effort, the costing server will create/update the cost, otherwise, the cost is updated, to be taken into account for the production run that consumes it. This fix is a contribution of Support Team. --- M src-db/database/model/functions/MA_PRODUCTION_COST.xml --- |
(0100833) dmiguelez (viewer) 2017-11-30 12:46 |
Code Review + Testing Ok |
(0101503) hudsonbot (viewer) 2018-01-03 12:39 |
A changeset related to this issue has been promoted main and to the Central Repository, after passing a series of tests. Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/c81e0d3cbab5 [^] Maturity status: Test |
![]() |
|||
Date Modified | Username | Field | Change |
2017-11-17 09:53 | ngarcia | New Issue | |
2017-11-17 09:53 | ngarcia | Assigned To | => Triage Finance |
2017-11-17 09:53 | ngarcia | OBNetwork customer | => Yes |
2017-11-17 09:53 | ngarcia | Modules | => Core |
2017-11-17 09:53 | ngarcia | Support ticket | => 49514 |
2017-11-17 09:53 | ngarcia | Resolution time | => 1512687600 |
2017-11-17 09:53 | ngarcia | Triggers an Emergency Pack | => No |
2017-11-17 09:54 | ngarcia | Issue Monitored: networkb | |
2017-11-17 14:48 | nonofrancisco | Assigned To | Triage Finance => nonofrancisco |
2017-11-17 14:48 | nonofrancisco | Status | new => scheduled |
2017-11-21 18:40 | ngarcia | File Added: work-effort.fix | |
2017-11-22 10:43 | ngarcia | Steps to Reproduce Updated | View Revisions |
2017-11-23 09:53 | ngarcia | Steps to Reproduce Updated | View Revisions |
2017-11-24 14:59 | nonofrancisco | Note Added: 0100706 | |
2017-11-30 12:34 | dmiguelez | Note Added: 0100830 | |
2017-11-30 12:36 | dmiguelez | Note Edited: 0100830 | View Revisions |
2017-11-30 12:38 | dmiguelez | Note Added: 0100831 | |
2017-11-30 12:44 | hgbot | Checkin | |
2017-11-30 12:44 | hgbot | Note Added: 0100832 | |
2017-11-30 12:44 | hgbot | Status | scheduled => resolved |
2017-11-30 12:44 | hgbot | Resolution | open => fixed |
2017-11-30 12:44 | hgbot | Fixed in SCM revision | => http://code.openbravo.com/erp/devel/pi/rev/4206e68ea96bcf6136b62a052c87895fcbd5905f [^] |
2017-11-30 12:46 | dmiguelez | Review Assigned To | => dmiguelez |
2017-11-30 12:46 | dmiguelez | Note Added: 0100833 | |
2017-11-30 12:46 | dmiguelez | Status | resolved => closed |
2017-11-30 12:46 | dmiguelez | Fixed in Version | => 3.0PR18Q1 |
2018-01-03 12:39 | hudsonbot | Checkin | |
2018-01-03 12:39 | hudsonbot | Note Added: 0101503 |