Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Revisions: Issue #37317 All Revisions ] Back to Issue ]
Summary 0037317: Costing Background Process stopped if the same product is produced and consumed in different production run of same work effort
Revision 2017-11-23 09:53 by ngarcia
Steps To Reproduce As group admin role:
   Create three products and set them as Production:
      RawMaterial
      WIP
      Final
   Set a Storage Bin for WIP and Final
   Add a purchase price list to RawMaterial and increase its stock
   Create a Manufacturing Cost Center and version
   Create an Activity and assign the previous Cost Center
   Create a Process Plan and Version
   Add two Operations to it
      Set RawMaterial as P- and WIP as P+ in first operation
      Set WIP as P- and Final as P+ in second operation
   Create a Work Requirement and process it
   Create a Work Effort
   Add two Production Run to it, one for each operation and set Completed Quantity
   Create Standards for both of them
   Validate it
   Launch the Costing Background Process and check the following error message is shown:
      java.lang.IllegalStateException: org.postgresql.util.PSQLException: ERROR: No average cost found for given product and date. Product: WIP, Date:...
Revision 2017-11-22 10:43 by ngarcia
Steps To Reproduce As group admin role:
   Create three products and set them as Production:
      RawMaterial
      WIP
      Final
   Set a Storage Bin for WIP and Final
   Add a purchase price list to RawMaterial and increase its stock
   Create a Manufacturing Cost Center and Activity
   Create a Process Plan and Version
   Add two Operations to it
      Set RawMaterial as P- and WIP as P+ in first operation
      Set WIP as P- and Final as P+ in second operation
   Create a Work Requirement and process it
   Create a Work Effort
   Add two Production Run to it, one for each operation and set Completed Quantity
   Create Standards for both of them
   Validate it
   Launch the Costing Background Process and check the following error message is shown:
      java.lang.IllegalStateException: org.postgresql.util.PSQLException: ERROR: No average cost found for given product and date. Product: WIP, Date:...
Revision 2017-11-21 18:40 by ngarcia
Steps To Reproduce As group admin role:
   Create three products and set them as Production:
      RawMaterial
      WIP
      Final
   Set a Storage Bin for WIP and Final
   Add a purchase price list to RawMaterial and increase its stock
   Create a Manufacturing Cost Center and Activity
   Create a Process Plan and Version
   Add two Operations to it
      Set RawMaterial as P- and WIP as P+ in first operation
      Set WIP as P- and Final as P+ in second operation
   Create a Work Requirement and process it
   Create a Work Effort
   Add two Production Run to it, one for each operation
   Validate it
   Launch the Costing Background Process and check the following error message is shown:
      java.lang.IllegalStateException: org.postgresql.util.PSQLException: ERROR: No average cost found for given product and date. Product: WIP, Date:...


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker