Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||||||
ID | ||||||||||||
0019615 | ||||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||||||
design defect | [Openbravo ERP] 06. Material requirement planning (MRP) | minor | have not tried | 2012-02-01 15:52 | 2012-09-13 10:43 | |||||||
Reporter | RenateNieuwkoop | View Status | public | |||||||||
Assigned To | dmiguelez | |||||||||||
Priority | normal | Resolution | open | Fixed in Version | ||||||||
Status | new | Fix in branch | Fixed in SCM revision | |||||||||
Projection | none | ETA | none | Target Version | ||||||||
OS | Any | Database | Any | Java version | ||||||||
OS Version | Database version | Ant version | ||||||||||
Product Version | 3.0MP7.1 | SCM revision | ||||||||||
Review Assigned To | ||||||||||||
Web browser | ||||||||||||
Modules | Core | |||||||||||
Regression level | ||||||||||||
Regression date | ||||||||||||
Regression introduced in release | ||||||||||||
Regression introduced by commit | ||||||||||||
Triggers an Emergency Pack | No | |||||||||||
Summary | 0019615: MRP: Planning method component 'Material Requirement' should be renamed to Requisition | |||||||||||
Description | As per issue 9910, the component 'Material Requirement' that is a value in the Planning Method screen, is actually referring to Requisitions. To avoid confusing the value should be renamed | |||||||||||
Steps To Reproduce | Go to the Planning method to the Lines tab and review the values in the Transaction type field. see screenshot | |||||||||||
Proposed Solution | Rename 'Material Requirement' to 'Requisition' (not to Material Requisition either, because the screen is the Requisition screen). | |||||||||||
Tags | OB3 Documentation | |||||||||||
Attached Files | IssuePlanningMethodvalue.png [^] (50,751 bytes) 2012-02-01 15:52
| |||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Copyright © 2000 - 2009 MantisBT Group |