Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0019615Openbravo ERP06. Material requirement planning (MRP)public2012-02-01 15:522012-09-13 10:43
RenateNieuwkoop 
dmiguelez 
normalminorhave not tried
newopen 
5
3.0MP7.1 
 
Core
No
0019615: MRP: Planning method component 'Material Requirement' should be renamed to Requisition
As per issue 9910, the component 'Material Requirement' that is a value in the Planning Method screen, is actually referring to Requisitions. To avoid confusing the value should be renamed
Go to the Planning method to the Lines tab and review the values in the Transaction type field. see screenshot
Rename 'Material Requirement' to 'Requisition' (not to Material Requisition either, because the screen is the Requisition screen).
OB3 Documentation
png IssuePlanningMethodvalue.png (50,751) 2012-02-01 15:52
https://issues.openbravo.com/file_download.php?file_id=4938&type=bug
png
Issue History
2012-02-01 15:52RenateNieuwkoopNew Issue
2012-02-01 15:52RenateNieuwkoopAssigned To => jonalegriaesarte
2012-02-01 15:52RenateNieuwkoopFile Added: IssuePlanningMethodvalue.png
2012-02-01 15:52RenateNieuwkoopModules => Core
2012-02-01 15:53RenateNieuwkoopTag Attached: OB3 Documentation
2012-09-13 10:43jonalegriaesarteAssigned Tojonalegriaesarte => dmiguelez

There are no notes attached to this issue.