Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0010877
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Modules] Accruals and Deferralstrivialalways2009-10-06 12:412009-10-09 09:10
ReportersureshbabuView Statuspublic 
Assigned Tojayakumar 
PrioritylowResolutionsuspendedFixed in Version
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version2.50
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Regression date
Regression introduced by commit
Regression level
Review Assigned To
Regression introduced in release
Summary

0010877: Error message not meaningful, when we post the plan line after editing the plan linea.

DescriptionAfter the plan is generated, i manually edited the plan lines accounting date and amount fields, to test the functionality of non linear plan generation and i found the error message shown by the system for some inputs, not provides much details to the end user and i have listed the below scenarios.

1) I edited the amount field from some valid amount to Zero and then i tried to post the plan line. system throws error message "ProcessRunError\nCreated=0"
which doesn't provide much details to the user.Its better to change the error message as "Amount Zero cannot be posted"

And for the below two scenarios i have used the below data to create the invoice
Date from: 01/08/2011
Date To: 30/11/2011
Plan Amount: 20

and plan is generated for the months 08,09,10,11 for the amount 5

2) i edited the plan line for the period 01/08/2011 and changed the accounting date to 01/08/2012. And tried to post the plan line system throws error message "ProcessRunError\nCreated=0" which doesn't provide much details to the user.Its better to change the error message as "Plan line accounting date is out of range"

3) Then later i edited the plan line for the period 01/09/2011 and changed the amount field to 1000 and saved the record. And then tried to post the plan line
system throws error message as "ProcessRunError\nCreated=0" which doesn't provide much details to the user.Its better to change the error message as "Total of plan lines amount cannot be greater than plan total amount"
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
depends on feature request 0010891pi newrmorley Openbravo ERP Unable to define a Proper error message when we working with modularity 
Not all the children of this issue are yet resolved or closed.

-  Notes
(0020827)
rajagopal (reporter)
2009-10-07 12:17

Refer to the below issue.

https://issues.openbravo.com/view.php?id=10891 [^]
(0020889)
rajagopal (reporter)
2009-10-09 07:53

As per the discussion which I had with Richard, this scope is not part of current functionality. So,I am closing this issue.
(0020892)
sureshbabu (reporter)
2009-10-09 09:10

https://issues.openbravo.com/view.php?id=10891 [^]

I am closing this issue, since this issue requires fix in the core.

- Issue History
Date Modified Username Field Change
2009-10-06 12:41 sureshbabu New Issue
2009-10-06 12:41 sureshbabu Assigned To => sathiyan
2009-10-07 09:45 jayakumar Assigned To sathiyan => jayakumar
2009-10-07 09:46 jayakumar Status new => scheduled
2009-10-07 12:17 rajagopal Note Added: 0020827
2009-10-07 12:21 rajagopal Relationship added depends on 0010891
2009-10-09 07:53 rajagopal Note Added: 0020889
2009-10-09 09:10 sureshbabu Status scheduled => closed
2009-10-09 09:10 sureshbabu Note Added: 0020892
2009-10-09 09:10 sureshbabu Resolution open => suspended


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker