Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||
ID | ||||||||
0010877 | ||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||
defect | [Modules] Accruals and Deferrals | trivial | always | 2009-10-06 12:41 | 2009-10-09 09:10 | |||
Reporter | sureshbabu | View Status | public | |||||
Assigned To | jayakumar | |||||||
Priority | low | Resolution | suspended | Fixed in Version | ||||
Status | closed | Fix in branch | Fixed in SCM revision | |||||
Projection | none | ETA | none | Target Version | 2.50 | |||
OS | Any | Database | Any | Java version | ||||
OS Version | Database version | Ant version | ||||||
Product Version | SCM revision | |||||||
Regression date | ||||||||
Regression introduced by commit | ||||||||
Regression level | ||||||||
Review Assigned To | ||||||||
Regression introduced in release | ||||||||
Summary | 0010877: Error message not meaningful, when we post the plan line after editing the plan linea. | |||||||
Description | After the plan is generated, i manually edited the plan lines accounting date and amount fields, to test the functionality of non linear plan generation and i found the error message shown by the system for some inputs, not provides much details to the end user and i have listed the below scenarios. 1) I edited the amount field from some valid amount to Zero and then i tried to post the plan line. system throws error message "ProcessRunError\nCreated=0" which doesn't provide much details to the user.Its better to change the error message as "Amount Zero cannot be posted" And for the below two scenarios i have used the below data to create the invoice Date from: 01/08/2011 Date To: 30/11/2011 Plan Amount: 20 and plan is generated for the months 08,09,10,11 for the amount 5 2) i edited the plan line for the period 01/08/2011 and changed the accounting date to 01/08/2012. And tried to post the plan line system throws error message "ProcessRunError\nCreated=0" which doesn't provide much details to the user.Its better to change the error message as "Plan line accounting date is out of range" 3) Then later i edited the plan line for the period 01/09/2011 and changed the amount field to 1000 and saved the record. And then tried to post the plan line system throws error message as "ProcessRunError\nCreated=0" which doesn't provide much details to the user.Its better to change the error message as "Total of plan lines amount cannot be greater than plan total amount" | |||||||
Tags | No tags attached. | |||||||
Attached Files | ||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |||||||||||||||
|
Notes | |
(0020827) rajagopal (reporter) 2009-10-07 12:17 |
Refer to the below issue. https://issues.openbravo.com/view.php?id=10891 [^] |
(0020889) rajagopal (reporter) 2009-10-09 07:53 |
As per the discussion which I had with Richard, this scope is not part of current functionality. So,I am closing this issue. |
(0020892) sureshbabu (reporter) 2009-10-09 09:10 |
https://issues.openbravo.com/view.php?id=10891 [^] I am closing this issue, since this issue requires fix in the core. |
Issue History | |||
Date Modified | Username | Field | Change |
2009-10-06 12:41 | sureshbabu | New Issue | |
2009-10-06 12:41 | sureshbabu | Assigned To | => sathiyan |
2009-10-07 09:45 | jayakumar | Assigned To | sathiyan => jayakumar |
2009-10-07 09:46 | jayakumar | Status | new => scheduled |
2009-10-07 12:17 | rajagopal | Note Added: 0020827 | |
2009-10-07 12:21 | rajagopal | Relationship added | depends on 0010891 |
2009-10-09 07:53 | rajagopal | Note Added: 0020889 | |
2009-10-09 09:10 | sureshbabu | Status | scheduled => closed |
2009-10-09 09:10 | sureshbabu | Note Added: 0020892 | |
2009-10-09 09:10 | sureshbabu | Resolution | open => suspended |
Copyright © 2000 - 2009 MantisBT Group |