Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0009925
TypeCategorySeverityReproducibilityDate SubmittedLast Update
backport[Openbravo ERP] 08. Project and service managementtrivialalways2009-07-16 09:222009-07-22 09:11
ReportersureshbabuView Statuspublic 
Assigned Toalostale 
PrioritylowResolutionfixedFixed in Version2.40MP8
StatusclosedFix in branch2.40Fixed in SCM revision3fda3860e874
ProjectionnoneETAnoneTarget Version
OSWindowsDatabasePostgreSQLJava version
OS VersionDatabase versionAnt version
Product Version2.40MP7SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0009925: Cancel button not responding in Change project status pop up window.

DescriptionCancel button not responding in Change project status pop up window (which appears after we click the change project status button in multiphase project window)
Steps To ReproduceMove to Go to Project & Service Management->Transactions->Multiphase Project
And enter the required details.
Then click the change project status button, change project status pop up window appears with OK and Cancel button.

Actual result: Try to click the cancel button, cancel button not responding

TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
blocks defect 0009921 closedalostale Cancel button not responding in Change project status pop up window. 

-  Notes
(0018324)
hgbot (developer)
2009-07-16 15:45

Repository: erp/stable/2.40
Changeset: 3fda3860e8747f29692227dcd8ba04725f3a7582
Author: Asier Lostalé <asier.lostale <at> openbravo.com>
Date: Thu Jul 16 11:28:08 2009 +0200
URL: http://code.openbravo.com/erp/stable/2.40/rev/3fda3860e8747f29692227dcd8ba04725f3a7582 [^]

fixed bug 0009925: Cancel button not responding in Change project status pop up window.

---
M src/org/openbravo/erpCommon/ad_actionButton/ChangeProjectStatus.html
---
(0018525)
arunkumar (reporter)
2009-07-22 09:11

If we click the cancel button the popup window goes away.This issue has been fixed.

- Issue History
Date Modified Username Field Change
2009-07-16 11:26 alostale Type defect => backport
2009-07-16 11:26 alostale fix_in_branch => 2.40
2009-07-16 15:45 hgbot Checkin
2009-07-16 15:45 hgbot Note Added: 0018324
2009-07-16 15:45 hgbot Status scheduled => resolved
2009-07-16 15:45 hgbot Resolution open => fixed
2009-07-16 15:45 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/stable/2.40/rev/3fda3860e8747f29692227dcd8ba04725f3a7582 [^]
2009-07-22 09:11 arunkumar Status resolved => closed
2009-07-22 09:11 arunkumar Note Added: 0018525
2009-07-22 09:11 arunkumar Fixed in Version => 2.40MP8


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker