Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | ||||||||||
ID | |||||||||||
0006103 | |||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | ||||||
feature request | [Openbravo ERP] 05. Production management | minor | have not tried | 2008-11-20 12:32 | 2011-02-04 09:15 | ||||||
Reporter | pmagnin | View Status | public | ||||||||
Assigned To | rmorley | ||||||||||
Priority | high | Resolution | open | Fixed in Version | |||||||
Status | acknowledged | Fix in branch | Fixed in SCM revision | ||||||||
Projection | none | ETA | none | Target Version | pi | ||||||
OS | Any | Database | Any | Java version | |||||||
OS Version | Database version | Ant version | |||||||||
Product Version | SCM revision | ||||||||||
Review Assigned To | |||||||||||
Web browser | |||||||||||
Modules | Core | ||||||||||
Regression level | |||||||||||
Regression date | |||||||||||
Regression introduced in release | |||||||||||
Regression introduced by commit | |||||||||||
Triggers an Emergency Pack | No | ||||||||||
Summary | 0006103: Kanban Manufacturing | ||||||||||
Description | Kanban is a method of Just-in-Time production that uses standard containers or lot sizes with a single card attached to each. It is a pull system in which work centers signal with a card or other device that they wish to withdraw parts from feeding operations or suppliers. The Japanese word kanban, loosely translated, means card, billboard, or sign, but other signaling devices such as colored golf balls have also been used. The term is often used synonymously for the specific scheduling system developed and used by the Toyota Corporation in Japan. Point-of-use storage/floor stock—keeping inventory in specified locations on a plant floor near the operation where it is to be used. | ||||||||||
Tags | ModuleCandidate, ReleaseCandidate | ||||||||||
Attached Files | |||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Issue History | |||
Date Modified | Username | Field | Change |
2008-11-20 12:32 | pmagnin | New Issue | |
2008-11-20 12:32 | pmagnin | Assigned To | => rafaroda |
2008-11-20 12:32 | pmagnin | sf_bug_id | 0 => 2317231 |
2008-11-20 12:32 | pmagnin | Regression testing | => No |
2008-11-20 12:33 | pmagnin | Assigned To | rafaroda => pmagnin |
2008-11-21 17:09 | pjuvara | Target Version | 2.60 => trunk |
2008-11-22 23:39 | pjuvara | Tag Attached: ModuleCandidate | |
2008-12-01 22:57 | pjuvara | Tag Attached: ReleaseCandidate | |
2008-12-01 22:57 | pjuvara | Assigned To | pmagnin => pjuvara |
2008-12-01 22:57 | pjuvara | Status | new => acknowledged |
2008-12-01 22:58 | pjuvara | Summary | Implement Kanban method for Manufacturing => Kanban Manufacturing |
2011-02-04 09:15 | jpabloae | Assigned To | pjuvara => rmorley |
Copyright © 2000 - 2009 MantisBT Group |