Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0038536
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Modules] Advanced Warehouse Operationsmajoralways2018-05-13 16:222018-05-13 16:22
ReporterdmiguelezView Statuspublic 
Assigned Todmiguelez 
PriorityurgentResolutionopenFixed in Version
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Regression date
Regression introduced by commit
Regression level
Review Assigned To
Regression introduced in release
Summary

0038536: Allow to switch between AUM and BUM in Tasks in Front End

DescriptionRecently, there has been an new development to allow to switch between AUM and BUM of a Product when creating a Put-Away in the Front End.

However, this is also necessary to be done for the Tasks too.

From a functional point of view:
The Tasks are always managed by the system in the BUM, the AUM logic is just a visualization to help the user to manage the Tasks in the primary AUM for Logistics flow.

But, as of now, it is not possible to confirm a 'partial' AUM, this is why this switch is needed.

Example for the client:
There is a Product which BUM is Units and it's AUM Boxes (1 Box 10 Units)
For time to time, they need to open a Box and remove 1 unit for the government to inspect it.
When doing the picking, the system proposes to pick 2 boxes, however, they are going to pick 9 units (1 Box has 1 unit less)
It should be possible to change the Task to Units and confirm the correct quantity
Steps To ReproduceRecently, there has been an new development to allow to switch between AUM and BUM of a Product when creating a Put-Away in the Front End.

However, this is also necessary to be done for the Tasks too.

From a functional point of view:
The Tasks are always managed by the system in the BUM, the AUM logic is just a visualization to help the user to manage the Tasks in the primary AUM for Logistics flow.

But, as of now, it is not possible to confirm a 'partial' AUM, this is why this switch is needed.

Example for the client:
There is a Product which BUM is Units and it's AUM Boxes (1 Box 10 Units)
For time to time, they need to open a Box and remove 1 unit for the government to inspect it.
When doing the picking, the system proposes to pick 2 boxes, however, they are going to pick 9 units (1 Box has 1 unit less)
It should be possible to change the Task to Units and confirm the correct quantity
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
has duplicate feature request 0038595 closeddmiguelez Allow to switch between AUM and BUM in Tasks in Front End 

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2018-05-13 16:22 dmiguelez New Issue
2018-05-13 16:22 dmiguelez Assigned To => dmiguelez
2018-05-24 16:36 dmiguelez Relationship added has duplicate 0038595
2022-09-06 17:18 caristu Category Advance Warehouse Operations => Advanced Warehouse Operations


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker