Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0035973
TypeCategorySeverityReproducibilityDate SubmittedLast Update
design defect[Modules] Cash Flow Forecastmajoralways2017-05-11 12:402017-05-11 14:29
ReportermaiteView Statuspublic 
Assigned ToTriage Omni OMS 
PriorityurgentResolutionopenFixed in Version
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Regression date
Regression introduced by commit
Regression level
Review Assigned To
Regression introduced in release
Summary

0035973: Cash Flow Forecast report should consider Payment Plan's Expected Date

DescriptionBy default, Expected Date and Due Date are the same and both based on Payment Terms of the invoice. In case revision is performed user is able to modify Expected Date. As purpose of Cash Flow Forecast report is to have a prevision as much real as possible, Expected Date should be considered in this cases
Steps To Reproduce1. Register Sales Invoice, process it and modify Expected Date in Payment Plan tab
2. Run Cash Flow Forecast report and realize that Due Date is considered instead of Expected date
Proposed SolutionTo include possibility of considering Expected Date but maintaining current report's behavior
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2017-05-11 12:40 maite New Issue
2017-05-11 12:40 maite Assigned To => Triage Finance
2017-05-11 12:40 maite Issue Monitored: networkb
2017-05-11 14:29 eugeni Issue Monitored: eugeni


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker