ID
0019646
TypeCategorySeverityReproducibilityDate SubmittedLast Update
design defect[Openbravo ERP] 06. Material requirement planning (MRP)minorhave not tried2012-02-03 09:132012-09-13 10:42
ReporterRenateNieuwkoopView Statuspublic 
Assigned Todmiguelez 
PrioritynormalResolutionopenFixed in Version
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version3.0MP7.1SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0019646: MRP set up: Minimum lead time in the Org Specifi tab should be changed to Production lead time

DescriptionIn the Product set up, in the Purchasing tab, there is a field 'Purchasing Lead Time'.
In the Org Specific tab there is a field 'Minimum Lead Time'. To make the label more clear, the label should be changed to 'Production Lead Time'.
Steps To ReproduceSee the following screenshots:
http://wiki.openbravo.com/wiki/Product#Purchasing [^]
http://wiki.openbravo.com/wiki/Product#Org_Specific [^]
Proposed SolutionChange the name to Production Lead Time
TagsOB3 Documentation
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2012-02-03 09:13 RenateNieuwkoop New Issue
2012-02-03 09:13 RenateNieuwkoop Assigned To => jonalegriaesarte
2012-02-03 09:13 RenateNieuwkoop Modules => Core
2012-02-03 09:13 RenateNieuwkoop Tag Attached: OB3 Documentation
2012-02-03 09:13 RenateNieuwkoop version => 3.0MP7.1
2012-09-13 10:42 jonalegriaesarte Assigned To jonalegriaesarte => dmiguelez