Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||||||
ID | ||||||||||||
0019646 | ||||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||||||
design defect | [Openbravo ERP] 06. Material requirement planning (MRP) | minor | have not tried | 2012-02-03 09:13 | 2012-09-13 10:42 | |||||||
Reporter | RenateNieuwkoop | View Status | public | |||||||||
Assigned To | dmiguelez | |||||||||||
Priority | normal | Resolution | open | Fixed in Version | ||||||||
Status | new | Fix in branch | Fixed in SCM revision | |||||||||
Projection | none | ETA | none | Target Version | ||||||||
OS | Any | Database | Any | Java version | ||||||||
OS Version | Database version | Ant version | ||||||||||
Product Version | 3.0MP7.1 | SCM revision | ||||||||||
Review Assigned To | ||||||||||||
Web browser | ||||||||||||
Modules | Core | |||||||||||
Regression level | ||||||||||||
Regression date | ||||||||||||
Regression introduced in release | ||||||||||||
Regression introduced by commit | ||||||||||||
Triggers an Emergency Pack | No | |||||||||||
Summary | 0019646: MRP set up: Minimum lead time in the Org Specifi tab should be changed to Production lead time | |||||||||||
Description | In the Product set up, in the Purchasing tab, there is a field 'Purchasing Lead Time'. In the Org Specific tab there is a field 'Minimum Lead Time'. To make the label more clear, the label should be changed to 'Production Lead Time'. | |||||||||||
Steps To Reproduce | See the following screenshots: http://wiki.openbravo.com/wiki/Product#Purchasing [^] http://wiki.openbravo.com/wiki/Product#Org_Specific [^] | |||||||||||
Proposed Solution | Change the name to Production Lead Time | |||||||||||
Tags | OB3 Documentation | |||||||||||
Attached Files | ||||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Copyright © 2000 - 2009 MantisBT Group |