Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0007820
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] B. User interfaceminorhave not tried2009-02-25 13:412009-04-22 00:01
ReporterplujanView Statuspublic 
Assigned ToDowid 
PrioritynormalResolutionfixedFixed in Version2.50
StatusclosedFix in branchFixed in SCM revision3421
ProjectionnoneETAnoneTarget Version
OSLinux 64 bitDatabasePostgreSQLJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0007820: On Multiphase Project, if I run the Generate Orders process I get a wrong message

DescriptionI create a new Organization to work with. Then, I create a Multiphase project for that Org. When running the Generate Orders process I get a message "null value in c_tax_id column violates the not null constraint"
Steps To Reproduce1. Create a new organization, OrgA.
2. Create a new multiphase project, complete all the required data and launch the Generate Orders process (on the project phase tab).
3. A message "null value in c_tax_id column violates the not null constraint" is shown. See attach.
Proposed Solution"Create sales order from project phase" process is working properly if every field is configured.

The error mentioned in this issue comes up if the organization selected has no location defined. If this happens the taxes can not be calculated and this error pops up.

This error is properly captured when creating a sales order manually. It needs to be captured in this process as well.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
related to defect 0006888 closedAinhoaPagola On Multiphase Project, I cannot run the generate sales order process 

-  Notes
(0014732)
Dowid (reporter)
2009-03-17 16:44

author David Abragimov <david.abragimov@opensuite.com>
    Tue Mar 17 17:27:39 2009
changeset 3421 5502a43ccb02

Bug fix 0007820: On Multiphase Project, if I run the Generate Orders process I get a wrong message

URL: https://code.openbravo.com/erp/devel/pi/rev/5502a43ccb02 [^]

--
 src-db/database/model/functions/C_GENERATESOFROMPROJECTPHASE.xml
---

- Issue History
Date Modified Username Field Change
2009-02-25 13:41 plujan New Issue
2009-02-25 13:41 plujan Assigned To => AinhoaPagola
2009-02-25 13:41 plujan Regression testing => No
2009-02-25 13:41 plujan Issue generated from 0006888
2009-02-25 13:41 plujan Relationship added related to 0006888
2009-02-25 13:42 plujan Status new => scheduled
2009-02-25 13:42 plujan fix_in_branch => trunk
2009-03-11 18:45 AinhoaPagola Assigned To AinhoaPagola => Dowid
2009-03-17 16:44 Dowid Note Added: 0014732
2009-03-17 16:44 Dowid Status scheduled => resolved
2009-03-17 16:44 Dowid Resolution open => fixed
2009-03-17 16:44 Dowid version 2.50alpha-r6 => pi
2009-03-17 16:44 Dowid Fixed in Version => pi
2009-03-17 16:44 Dowid Fixed in SCM revision => 3421
2009-03-17 16:44 Dowid fix_in_branch pi =>
2009-04-21 10:53 psarobe Status resolved => closed
2009-04-22 00:01 anonymous sf_bug_id 0 => 2778013


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker