feature request[Openbravo ERP] 05. Production managementminorhave not tried2008-11-20 18:552011-12-27 11:44
ReporterpmagninView Statuspublic 
Assigned Tormorley 
PrioritynormalResolutionopenFixed in Version
StatusacknowledgedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Versionpi
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0006124: Work Effort validate process Improvement

DescriptionWe don't have any control of the usage of cost centers, we can create lots of work requirements for the same day without any warning, related to this the machines definition in the manufacturing processes is also very basic and confusing

New info:
1 - Work Effort validate process Improvement:
In the Window ‘Work Effort’, the button ‘Validate Work Effort’ is linked to a PL/SQL process that realized the Warehouse movements and calculation of production costs. This script can be improved in the way to determine costs and performance.

2 - Improve the Process Plan and Work Requirement definition to include the attributes and the ability to inherit them:
This project was initially scheduled for 2.40, then postponed. the window ‘Production Plan’ and ‘Work Requirements’ do not include the product attributes. We should be able to define how the products can inherit attributes or how they use raw material with attributes.
We first need to close the FR 0004149

Examples:
If I use raw material with the attribute green paint, I would like the final product with the same attribute.
If I have a ‘Work requirement’ to manufacture a XL Tee-shirt, I would like to define this attribute there to have automatically the same attribute when I create the ’Work Effort’ for the final product.




TagsReleaseCandidate
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0010859)
pjuvara (reporter)
2008-12-01 22:59

Please provide more details on the desired functionality.

- Issue History
Date Modified Username Field Change
2008-11-20 18:55 pmagnin New Issue
2008-11-20 18:55 pmagnin Assigned To => pmagnin
2008-11-20 18:55 pmagnin sf_bug_id 0 => 2318124
2008-11-20 18:55 pmagnin Regression testing => No
2008-11-21 17:09 pjuvara Target Version 2.60 => trunk
2008-12-01 22:59 pjuvara Note Added: 0010859
2008-12-01 22:59 pjuvara Status new => feedback
2008-12-02 15:46 pmagnin Status feedback => new
2008-12-02 15:46 pmagnin Description Updated
2008-12-02 17:25 pmagnin Description Updated
2008-12-09 18:31 pjuvara Summary Cost Centers Management => Work Effort validate process Improvement
2008-12-09 18:51 pjuvara Tag Attached: ReleaseCandidate
2008-12-09 18:51 pjuvara Assigned To pmagnin => pjuvara
2008-12-09 18:51 pjuvara Status new => acknowledged
2011-02-04 09:15 jpabloae Assigned To pjuvara => rmorley
2011-12-27 11:44 RenateNieuwkoop Issue Monitored: RenateNieuwkoop


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker