Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0004920
TypeCategorySeverityReproducibilityDate SubmittedLast Update
backport[Openbravo ERP] 05. Production managementminoralways2008-09-09 17:262009-03-26 18:45
ReporterxplacescView Statuspublic 
Assigned Togorkaion 
PrioritynormalResolutionfixedFixed in Version2.40MP4
StatusclosedFix in branch2.40Fixed in SCM revisionc246fea63192
ProjectionnoneETAnoneTarget Version
OSWindowsDatabaseOracleJava version1.5
OS VersionXPDatabase version10g XEAnt version1.7
Product Version2.40betaSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0004920: Production MRP - Needed Product Quantity versus Work Requirement Quantity

DescriptionWhen launching Production MRP, system works as follow:
* calculates needed quantities (Q)
* proposes work requirements

Then with you launch work requirements, it creates a work requirement and fixes Quantity = Q. However, Q is product quantity but Quantity field in a Work Requirement, represents the number of times a work requirement will be executed, so it does not correspond exactly to produced products.
Steps To Reproduce* Create a Process Plan including just one only operation and a product P+ produced in a quantity of 2

* Set up Production MRP in order to obtain a proposed work requirement for example with a quantity of 10

* Launch work requirements in MRP

* System will create a work requirement with a quantity field (in header) of 10, which really will mean 20 units of produced product, while needed quantity was 10
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
blocks defect 0004688 closedgorkaion Production MRP - Needed Product Quantity versus Work Requirement Quantity 

-  Notes
(0014581)
hgbot (developer)
2009-03-11 15:02

Repository: erp/stable/2.40
Changeset: c246fea6319287b3b8a1411eddc9fb062554955f
Author: Gorka Ion Damián <gorkaion.damian <at> openbravo.com>
Date: Tue Mar 10 15:18:25 2009 +0100
URL: http://code.openbravo.com/erp/stable/2.40/rev/c246fea6319287b3b8a1411eddc9fb062554955f [^]

Fixed bug 4920. The procedure to generate work requirements now calculates correctly the process plan quantity.

---
M src-db/database/model/functions/MRP_WORKREQUIREMENT.xml
---
(0015022)
psarobe (manager)
2009-03-26 18:45

Steps to reproduce not clear

- Issue History
Date Modified Username Field Change
2008-09-09 17:26 anonymous New Issue
2008-09-09 17:26 anonymous Assigned To => gorkaion
2008-09-09 17:26 anonymous Status new => scheduled
2008-09-09 17:26 anonymous fix_in_branch => 2.40
2009-03-11 15:02 hgbot Checkin
2009-03-11 15:02 hgbot Note Added: 0014581
2009-03-11 15:02 hgbot Status scheduled => resolved
2009-03-11 15:02 hgbot Resolution open => fixed
2009-03-11 15:02 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/stable/2.40/rev/c246fea6319287b3b8a1411eddc9fb062554955f [^]
2009-03-24 11:01 psarobe Fixed in Version => 2.40MP4
2009-03-26 18:45 psarobe Regression testing => No
2009-03-26 18:45 psarobe Status resolved => closed
2009-03-26 18:45 psarobe Note Added: 0015022


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker