Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0004688
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2008-08-22 19:222009-04-21 10:53
ReporterxplacescView Statuspublic 
Assigned Togorkaion 
PrioritynormalResolutionfixedFixed in Version2.50
StatusclosedFix in branchpiFixed in SCM revision0c68073998d4
ProjectionnoneETAnoneTarget Version
OSWindowsDatabaseOracleJava version1.5
OS VersionXPDatabase version10g XEAnt version1.7
Product Version2.40betaSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0004688: Production MRP - Needed Product Quantity versus Work Requirement Quantity

DescriptionWhen launching Production MRP, system works as follow:
* calculates needed quantities (Q)
* proposes work requirements

Then with you launch work requirements, it creates a work requirement and fixes Quantity = Q. However, Q is product quantity but Quantity field in a Work Requirement, represents the number of times a work requirement will be executed, so it does not correspond exactly to produced products.
Steps To Reproduce* Create a Process Plan including just one only operation and a product P+ produced in a quantity of 2

* Set up Production MRP in order to obtain a proposed work requirement for example with a quantity of 10

* Launch work requirements in MRP

* System will create a work requirement with a quantity field (in header) of 10, which really will mean 20 units of produced product, while needed quantity was 10
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
depends on backport 0004920 closedgorkaion Production MRP - Needed Product Quantity versus Work Requirement Quantity 
related to backport 00112482.50MP25 closedadrianromero Work Requirement: Rounding issue for Quantity field for WR created by MRP 

-  Notes
(0014554)
hgbot (developer)
2009-03-10 15:22

Repository: erp/devel/pi
Changeset: 0c68073998d40814df7c074a10dc397d748491f2
Author: Gorka Ion Damián <gorkaion.damian <at> openbravo.com>
Date: Tue Mar 10 15:21:34 2009 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/0c68073998d40814df7c074a10dc397d748491f2 [^]

Fixed bug 4688. The procedure to generate work requirements now calculates correctly the process plan quantity.

---
M src-db/database/model/functions/MRP_WORKREQUIREMENT.xml
---

- Issue History
Date Modified Username Field Change
2008-08-22 19:22 xplacesc New Issue
2008-08-22 19:22 xplacesc Assigned To => cromero
2008-08-22 19:22 xplacesc sf_bug_id 0 => 2067908
2008-09-01 12:02 psarobe Status new => scheduled
2008-09-01 12:02 psarobe Assigned To cromero => gorkaion
2008-09-01 12:02 psarobe fix_in_branch => trunk
2009-03-10 15:22 hgbot Checkin
2009-03-10 15:22 hgbot Note Added: 0014554
2009-03-10 15:22 hgbot Status scheduled => resolved
2009-03-10 15:22 hgbot Resolution open => fixed
2009-03-10 15:22 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/0c68073998d40814df7c074a10dc397d748491f2 [^]
2009-04-21 10:53 psarobe Status resolved => closed
2011-01-18 16:15 adrianromero Relationship added related to 0011248


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker