Project:
| View Revisions: Issue #19523 | [ All Revisions ] [ Back to Issue ] | ||
| Summary | 0019523: Waiting period label in Check Point tab of the Periodic Quality Control has to be redefined | ||
| Revision | 2012-01-30 15:47 by VictorVillar | ||
| Description | Waiting period label in Check Point tab of the Periodic Quality Control has to be redefined. This field is consider in hours. | ||
| Revision | 2012-01-30 13:21 by VictorVillar | ||
| Description | Waiting time label in Check Point tab of the Periodic Quality Control has to be redefined. This field is consider in hours. | ||
| Copyright © 2000 - 2009 MantisBT Group |