Summary 0045164: The cost of a salary category and machine defined for the future is taken into account in a work effort
Revision 2020-10-09 10:59 by ngarcia
Steps To Reproduce Create two products: "consumed" and "produced"
Set them as production
Set a storage bin for "produced" product in Product - Manufacturing tab
Set a cost of 1 for "consumed" product in Product - Costing tab
Increase the stock of the "consumed" one (you can use a physical inventory)

Create a Salary Category
Set a Cost to it:
   Cost: 1000
   Cost UOM: per Produced Units
   Starting date: today
Create a Machine:
Set a Cost to it:
   Cost: 1000
   Cost UOM: per Produced Units
   Starting date: a date in the future (06-10-2021)
Create a Manufacting Cost Center and version (valid from today)
Add the Machine to it
Add the Salary Category to it
Go to Salary category and change its Cost starting date to a date in the future (06-10-2021)
Create an Activity and assign the previously created cost center
Create a Process Plan, Version and Operation
Assign the previously created Activity to the Operation
Set a Cost Center Use time
Select Create Standards
Add in I/O products tab the "consumed" product as Product use (P-) and the "produced" product as Product Production (P+)
Create a Work Requirement
Assign the previously created Process Plan
Process it

Create Work Effort
Go to Work Effort and assign the Cost Center Version, Salary Category and Machine
Validate it

Launch the costing background process and check the cost of the salary category and machine has been taken into account for cost calculation and they shouldn't as they are not valid in the current date
Revision 2020-10-06 17:57 by ngarcia
Steps To Reproduce Create two products: "consumed" and "produced"
Set them as production
Set a storage bin for "produced" product in Product - Manufacturing tab
Set a cost of 1 for "consumed" product in Product - Manufacturing tab
Increase the stock of the "consumed" one (you can use a physical inventory)

Create a Salary Category
Set a Cost to it:
   Cost: 1000
   Cost UOM: per Produced Units
   Starting date: today
Create a Machine:
Set a Cost to it:
   Cost: 1000
   Cost UOM: per Produced Units
   Starting date: a date in the future (06-10-2021)
Create a Manufacting Cost Center and version (valid from today)
Add the Machine to it
Add the Salary Category to it
Go to Salary category and change its Cost starting date to a date in the future (06-10-2021)
Create an Activity and assign the previously created cost center
Create a Process Plan, Version and Operation
Assign the previously created Activity to the Operation
Set a Cost Center Use time
Select Create Standards
Add in I/O products tab the "consumed" product as Product use (P-) and the "produced" product as Product Production (P+)
Create a Work Requirement
Assign the previously created Process Plan
Process it

Create Work Effort
Go to Work Effort and assign the Cost Center Version, Salary Category and Machine
Validate it

Launch the costing background process and check the cost of the salary category and machine has been taken into account for cost calculation and they shouldn't as they are not valid in the current date
Revision 2020-09-30 16:59 by Leyre
Steps To Reproduce When a salary category or machine has an assigned cost with a date higher than the current one, the database function = "MA_PRODUCTION_COST" returns the assigned cost wrong, because it should be the one with a higher date but always below of the current date.

However, the function returns the one with a higher date.
Revision 2020-09-30 16:36 by Leyre
Steps To Reproduce When a salary category has an assigned cost with a date higher than the current one, the database function = "MA_PRODUCTION_COST" returns the assigned cost wrong, because it should be the one with a higher date but always below of the current date.

However, the function returns the one with a higher date.