Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0007115
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 07. Sales managementmajoralways2009-01-23 17:462009-04-21 12:39
ReporterRenateNieuwkoopView Statuspublic 
Assigned ToAinhoaPagola 
PrioritynormalResolutionfixedFixed in Version
StatusclosedFix in branchpiFixed in SCM revision12576
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version2.40SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0007115: Commission: Last run date doesn't get updated

DescriptionSales Management || Setup || Commission
When running 'Generate commission' the 'last run date should be updated to the run date. However, that's not done. I ran the 'generate commission' today but the date stays at 1-1-2009.
Steps To ReproduceSales Management || Setup || Commission
- Create a record for a certain BP
- check 'list details' checkbox
- Lines: remove filters and add 'multiplier amount' of 0.20 for example and save
- Header: Click 'Generate Commission' button
- Starting date: 1-1-2009, click ok

Then check if the 'last run date' was updated to today's date.

Proposed SolutionAccording to the help function, the last run date is supposed to reflect the last date that the process was run.
Tagscomsup_sprint5
Attached Filesjpg file icon 230109Lastrundate1.jpg [^] (193,711 bytes) 2009-01-23 17:46


jpg file icon 230109Commission1.jpg [^] (154,554 bytes) 2009-01-23 17:46


jpg file icon 230109Commission2.jpg [^] (158,598 bytes) 2009-01-23 17:47

- Relationships Relation Graph ] Dependency Graph ]
depends on backport 0007286 closedAinhoaPagola Commission: Last run date doesn't get updated 

-  Notes
(0012944)
AinhoaPagola (reporter)
2009-01-30 18:52

Hi Renate,
The last run date is going to be set to "today".
Thanks.
(0012948)
svnbot (reporter)
2009-01-30 19:36

Repository: openbravo
Revision: 12576
Author: AinhoaPagola
Date: 2009-01-30 19:36:12 +0100 (Fri, 30 Jan 2009)

Fixes bug 0007115 Last run date in commission is updated.

---
U trunk/src-db/database/model/functions/C_COMMISSION_PROCESS.xml
---

https://dev.openbravo.com/websvn/openbravo/?rev=12576&sc=1 [^]

- Issue History
Date Modified Username Field Change
2009-01-23 17:46 RenateNieuwkoop New Issue
2009-01-23 17:46 RenateNieuwkoop Assigned To => rafaroda
2009-01-23 17:46 RenateNieuwkoop sf_bug_id 0 => 2531350
2009-01-23 17:46 RenateNieuwkoop File Added: 230109Lastrundate1.jpg
2009-01-23 17:46 RenateNieuwkoop File Added: 230109Commission1.jpg
2009-01-23 17:47 RenateNieuwkoop File Added: 230109Commission2.jpg
2009-01-30 17:55 psarobe Status new => scheduled
2009-01-30 17:55 psarobe fix_in_branch => trunk
2009-01-30 18:46 AinhoaPagola Assigned To rafaroda => AinhoaPagola
2009-01-30 18:52 AinhoaPagola Note Added: 0012944
2009-01-30 19:36 svnbot Checkin
2009-01-30 19:36 svnbot Note Added: 0012948
2009-01-30 19:36 svnbot Status scheduled => resolved
2009-01-30 19:36 svnbot Resolution open => fixed
2009-01-30 19:36 svnbot svn_revision => 12576
2009-02-06 15:59 AinhoaPagola Tag Attached: comsup_sprint5
2009-04-21 12:39 psarobe Status resolved => closed


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker