backport[Openbravo ERP] 06. Material requirement planning (MRP)minoralways2008-10-27 10:252009-05-20 12:03
ReporterRenateNieuwkoopView Statuspublic 
Assigned ToAinhoaPagola 
PrioritynormalResolutionfixedFixed in Version2.40MP3
StatusclosedFix in branchpiFixed in SCM revision12305
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseOracleJava version
OS VersionDatabase versionAnt version
Product Version2.40betaSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0005668: Purchasing Plan: Purchase Orders created are in locked status

DescriptionMaterial Requirement Planning (MRP) || Transactions || Purchasing Plan

When you run the Purchasing plan and the outcome is suggested purchase orders, when you click 'Create Purchase Orders' the actual Purchase Order is created.

The Purchase Order is not in draft status, but in locked status. So you first have to unlock it. It has happened to me during teaching class, I saw it happened to the students also and Josep Tarbal who was teaching had the same result.
Proposed SolutionMake sure that the created Purchase Order is in 'draft' status
Tagscomsup_sprint5
Attached Filesjpg file icon 200109Issue5668snap1.jpg [^] (216,399 bytes) 2009-01-20 11:07


jpg file icon 200109Issue5668snap2.jpg [^] (215,777 bytes) 2009-01-20 11:09


jpg file icon 200109Issue5668snap3.jpg [^] (94,957 bytes) 2009-01-20 11:09

- Relationships Relation Graph ] Dependency Graph ]
blocks defect 0005603 closedAinhoaPagola Purchasing Plan: Purchase Orders created are in locked status 

-  Notes
(0012019)
AinhoaPagola (reporter)
2009-01-09 12:12
edited on: 2009-01-13 12:47

I can't reproduce this bug in 2.40. Can you verify the bug still exists and provide the steps to reproduce it?

(0012380)
RenateNieuwkoop (reporter)
2009-01-20 11:05

Hi Ainhoa,

The strange thing is that you go to the created PO and you see that it is in Draft status, which looks normal. However, when you click the 'complete' button, it shown 'unlock', so it appears that the PO is locked and needs unlocking before you can actually complete the order.

I used the data in the training environment. So I had the product 'hammer'. You'll find the exercise in the Production module of the BFT training that you followed in Pamplona.
These are the data: stock of the hammer 985, 1000 safety stock
                    PO for 40x, SO for 350x
Then when you run the purchasing plan you get suggested POs and when you create them they are in 'draft' status, but locked (you find out when trying to complete the PO).

thanks
Renate
(0012676)
AinhoaPagola (reporter)
2009-01-27 11:36

Hi Renate.

I have verified that the issue still exists and will be fixed shortly.

Thank you very much.
(0012677)
svnbot (reporter)
2009-01-27 11:39

Repository: openbravo
Revision: 12305
Author: AinhoaPagola
Date: 2009-01-27 11:39:50 +0100 (Tue, 27 Jan 2009)

Fixes bug 0005668 Purchase Orders are created in lock status. 'Processing' column set to 'N' when inserts are done into c_order in mrp_purchaseorder function.

---
U branches/r2.40/src-db/database/model/functions/MRP_PURCHASEORDER.xml
---

https://dev.openbravo.com/websvn/openbravo/?rev=12305&sc=1 [^]
(0016500)
sureshbabu (reporter)
2009-05-20 12:03

Tested working fine

- Issue History
Date Modified Username Field Change
2008-10-27 10:25 psarobe New Issue
2008-10-27 10:25 psarobe Assigned To => gorkaion
2008-10-27 10:25 psarobe Status new => scheduled
2009-01-08 16:27 gorkaion Assigned To gorkaion => AinhoaPagola
2009-01-09 12:12 AinhoaPagola Note Added: 0012019
2009-01-09 12:12 AinhoaPagola Status scheduled => feedback
2009-01-09 12:13 AinhoaPagola Note Edited: 0012019
2009-01-13 12:47 AinhoaPagola Note Edited: 0012019
2009-01-20 11:05 RenateNieuwkoop Note Added: 0012380
2009-01-20 11:07 RenateNieuwkoop File Added: 200109Issue5668snap1.jpg
2009-01-20 11:09 RenateNieuwkoop File Added: 200109Issue5668snap2.jpg
2009-01-20 11:09 RenateNieuwkoop File Added: 200109Issue5668snap3.jpg
2009-01-21 17:02 AinhoaPagola Status feedback => scheduled
2009-01-21 17:02 AinhoaPagola fix_in_branch 2.40 => trunk
2009-01-27 11:36 AinhoaPagola Note Added: 0012676
2009-01-27 11:39 svnbot Checkin
2009-01-27 11:39 svnbot Note Added: 0012677
2009-01-27 11:39 svnbot Status scheduled => resolved
2009-01-27 11:39 svnbot Resolution open => fixed
2009-01-27 11:39 svnbot svn_revision => 12305
2009-01-29 11:48 AinhoaPagola Tag Attached: comsup_sprint5
2009-05-20 12:03 sureshbabu Regression testing => No
2009-05-20 12:03 sureshbabu Status resolved => closed
2009-05-20 12:03 sureshbabu Note Added: 0016500