Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0000459
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 08. Project and service managementmajoralways2008-05-28 09:272008-07-01 17:56
ReporterrafarodaView Statuspublic 
Assigned Torafaroda 
PrioritynormalResolutionfixedFixed in Version2.40alpha-r3
StatusclosedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version2.40
OSLinux 32 bitDatabaseOracleJava version1.5
OS VersionUbuntu 7.10Database version10 g SEAnt version1.7
Product VersionpiSCM revision4598 
Merge Request Status
Review Assigned To
OBNetwork customerNo
Web browser
ModulesCore
Support ticket
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0000459: Project Building Site Report issues

DescriptionProject Building Site Report presents the following issues:
* Report totals are not correctly calculated.
* Initiative Type drop-down does not show values.
* Multiple selector called Province only displays Spanish provinces.
* There is no PDF Format button but a Print button.
* Responsible (Person in Charge) drop down is displaying Sales Representatives.
* Building Site Type multiple selector displays Work Type values.
* Situation multiple selector displays Project Status values.
* Both Multiphase and Service projects are reported. This does not make sense since it is a report specific for Service projects.
* Report displays Quantity in m2 and Price in /m2 that is very specific to Building projects.
* Project Building Site Report is not a proper name since now there is only Service Projects.
Steps To Reproduce1) Go to 'Project & Service Management || Analysis Tools || Project Building Site Report'
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0000369)
svnbot (viewer)
2008-05-28 10:09

Repository: openbravo
Revision: 4602
Author: rafaroda
Date: 2008-05-28 10:09:11 +0200 (Wed, 28 May 2008)

Fixes bug 0000459 Renamed report to Service Project Report since Multiphase Projects are not displayed. Report totals are now correctly calculated. Initiative Type drop-down shows values. Provinces multiple selector has been deleted and other filters re-ordered. Now shows a PDF Format button. Responsible is now Sales Representative. Building Site Type is now Work Type. Situation is Project Status. References to m2 have been deleted.

---
U trunk/src/org/openbravo/erpCommon/ad_reports/ReportProjectBuildingSiteJR.html
U trunk/src/org/openbravo/erpCommon/ad_reports/ReportProjectBuildingSiteJR.java
U trunk/src/org/openbravo/erpCommon/ad_reports/ReportProjectBuildingSiteJR.jrxml
U trunk/src/org/openbravo/erpCommon/ad_reports/ReportProjectBuildingSite_data.xsql
U trunk/src-db/database/sourcedata/AD_MENU.xml
U trunk/src-db/database/sourcedata/AD_PROCESS.xml
U trunk/src-db/database/sourcedata/AD_REF_LIST.xml
U trunk/src-db/database/sourcedata/AD_TEXTINTERFACES.xml
---

https://dev.openbravo.com/websvn/openbravo/?rev=4602&sc=1 [^]

- Issue History
Date Modified Username Field Change
2008-05-28 09:27 rafaroda New Issue
2008-05-28 09:27 rafaroda Assigned To => rafaroda
2008-05-28 09:27 rafaroda OBNetwork customer => N
2008-05-28 09:39 rafaroda Status new => scheduled
2008-05-28 10:09 svnbot Checkin
2008-05-28 10:09 svnbot Note Added: 0000369
2008-05-28 10:09 svnbot Status scheduled => resolved
2008-05-28 10:09 svnbot Resolution open => fixed
2008-06-11 14:15 cromero Target Version => 2.40
2008-06-11 14:33 cromero Fixed in Version => 2.40alpha r3
2008-06-20 17:26 plujan Status resolved => closed
2008-07-01 17:56 anonymous sf_bug_id 0 => 2007899


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker