Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0004478
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Openbravo ERP] 08. Project and service managementminoralways2008-07-21 18:252011-02-04 09:16
ReporterrafarodaView Statuspublic 
Assigned Tormorley 
PrioritynormalResolutionopenFixed in Version
StatusacknowledgedFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSLinux 32 bitDatabasePostgreSQLJava version1.5
OS VersionUbuntu 7.10Database version8.3Ant version1.7
Product VersionpiSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0004478: Hierarchichal projects

DescriptionProject/Task planning/scheduling tools [1] do not use the concept of phases and tasks (as child of phases) but only use the concept of tasks/todos (that can be child one of the others). This allow to make more than 2 levels of "childhood" while, with phases and tasks, one can not.

Besides, these tools permit to define milestones, that are significant tasks for a project [2].

[1] http://en.wikipedia.org/wiki/List_of_project_management_software [^]
[2] http://en.wikipedia.org/wiki/Milestone_%28project_management%29 [^]
Steps To ReproduceGo to Project & Service Management || Transactions || Multiphase Project
Proposed SolutionThe proposed solution is to create a new project type named 'Hierarchical projects' with the following characteristics:
* A header similar to existing Multiphase and Service projects.
* A tab to create, edit and delete its tasks.
* A button to set a hierarchy (tree) between tasks in an easy manner (such as in Financial Management || Accounting || Setup || Account Tree || Element >> Element Value)
* The ability to set a hierarchical project type ('Set Project Type' button)
* The ability to define a task as a Milestone

In addition to this:
* The ability to set a new project type with project category 'Hierarchical project' (with standard tasks, that can be milestones) and use it as a mould for new hierarchical projects.
* The ability to report by this new type of project.
* The ability to assign one or more products to a task [1].
* The ability to assign one or more employees to the project or tasks [2].

[1] https://issues.openbravo.com/view.php?id=4473 [^]
[2] https://issues.openbravo.com/view.php?id=4477 [^]
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
blocks feature request 0000502 acknowledgedrmorley Projects enhancements 
blocks feature request 0004528 acknowledgedrmorley Integrate Openbravo ERP with a project management/scheduling tool 

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2008-07-21 18:25 rafaroda New Issue
2008-07-21 18:25 rafaroda Assigned To => rafaroda
2008-07-21 18:25 rafaroda sf_bug_id 0 => 2023731
2008-07-21 18:27 rafaroda Relationship added blocks 0000502
2008-07-27 18:15 rafaroda Relationship added blocks 0004528
2008-11-10 14:25 rafaroda Assigned To rafaroda => pjuvara
2008-11-16 15:47 pjuvara Status new => acknowledged
2011-02-04 09:16 jpabloae Assigned To pjuvara => rmorley


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker