View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0024714
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2013-09-06 14:392013-10-29 17:53
ReporterVictorVillarView Statuspublic 
Assigned Tojecharri 
PriorityimmediateResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revision8dd45748904f
ProjectionnoneETAnoneTarget Version3.0MP30
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned ToVictorVillar
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0024714: The Production Cost Report should represent the Standard Cost column per produced unit produced

DescriptionThe Production Cost Report should represent the Standard Cost column (pull-down menu information) per produced unit produced. Please check the attached screenshot. Realise that the information for the Real Cost column, is defined per unit produced, (the standard cost total too), but the problem is the pull-down information for Standard cost, which is represented per the total of the produced qty. In this example the qty produced is 10.
Steps To ReproduceAs group Admin role,

1)Configure the Manufacturing Cost Center:
  Employee tab: cost per hour = 5.

2)Configure the related information for production management:
-two products checked as Production
- create the Process plan, assigning the Manufacturing Cost Center created before, to the activity.
 *I /O Products: P- (qty = 1) and P+ (qty = 10)`using the products created before.
* cost center use time = 1

3)Assign this Process PLan to the products in Product window.
4) Create the work requirement for this process plan, qt= 1, process it.
5) Create the Work Effort of this Work Requirement and Create Standards and Validate it.

6)'Calculate the Standard Cost' process, and realise that the Costing Background has been finished successfully.

7)Launch the Production Cost Report, deploy the information of the produced product, realise that Realise that the information for the Real Cost column, is defined per unit produced, (the standard cost total too), but the problem is the pull-down information for Standard Cost, which is represented per the total of the produced qty.













TagsNo tags attached.
Attached Filespng file icon ProductionCostReportBSC-003130914.png [^] (9,297 bytes) 2013-09-06 14:39

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0061903)
hgbot (developer)
2013-10-25 11:12

Repository: erp/devel/pi
Changeset: 8dd45748904ffa4e9c189812641949a132531859
Author: Javier Etxarri <javier.echarri <at> openbravo.com>
Date: Fri Oct 25 11:13:02 2013 +0200
URL: http://code.openbravo.com/erp/devel/pi/rev/8dd45748904ffa4e9c189812641949a132531859 [^]

Fixes issue 24714: The Production Cost Report should represent
the Standard Cost column per produced unit produced

---
M src/org/openbravo/erpCommon/ad_reports/ReportProductionCost_data.xsql
---
(0061922)
VictorVillar (developer)
2013-10-28 17:13

Verified
(0061946)
hudsonbot (developer)
2013-10-29 17:53

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/f1ae0e6fd033 [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2013-09-06 14:39 VictorVillar New Issue
2013-09-06 14:39 VictorVillar Assigned To => dmiguelez
2013-09-06 14:39 VictorVillar File Added: ProductionCostReportBSC-003130914.png
2013-09-06 14:39 VictorVillar Modules => Core
2013-09-06 14:39 VictorVillar Triggers an Emergency Pack => No
2013-09-06 14:40 VictorVillar Issue Monitored: networkb
2013-09-12 09:32 dmiguelez Assigned To dmiguelez => jonalegriaesarte
2013-10-09 19:14 jonalegriaesarte Assigned To jonalegriaesarte => jecharri
2013-10-09 19:15 jonalegriaesarte Target Version => 3.0MP30
2013-10-25 11:12 hgbot Checkin
2013-10-25 11:12 hgbot Note Added: 0061903
2013-10-25 11:12 hgbot Status new => resolved
2013-10-25 11:12 hgbot Resolution open => fixed
2013-10-25 11:12 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/8dd45748904ffa4e9c189812641949a132531859 [^]
2013-10-28 17:13 VictorVillar Review Assigned To => VictorVillar
2013-10-28 17:13 VictorVillar Note Added: 0061922
2013-10-28 17:13 VictorVillar Status resolved => closed
2013-10-29 17:53 hudsonbot Checkin
2013-10-29 17:53 hudsonbot Note Added: 0061946