Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0021980
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 07. Sales managementmajoralways2012-10-17 18:152012-12-17 13:33
ReportermaiteView Statuspublic 
Assigned ToioritzCia 
PriorityurgentResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revisionb8adf9e3f452
ProjectionnoneETAnoneTarget Version3.0MP19
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0021980: Commission defined as Basis Status "Fully Paid Documents" should consider payment date (instead of document date)

DescriptionCommission defined as Basis Status "Fully Paid Documents" should consider payment date (instead of document date)
Steps To Reproduce1. Create Sales Invoice with date 26/09/2012. Add any line and process
2. Define Commission for same BP, Frequency=Semi-monthly, Basis Document=Invoice. Basis Status=Fully paid. Add Commission line setting same BP and any "multiplier quantity
3. Run Generate Commission process with date 28/09/2012 (period considered will be 16/09 to 30/09). Realize that invoice is not considered (which is correct as is not paid yet)
4. Pay invoice with date 05/10/2012
5. Run Generate Commission process for with date 08/10/2012 (period considered will be 01/10 to 15/10). Realize that Invoice is not considered (because currently we are looking at invoice's date 26/09/2012 which is not in period 01/10 to 15/10). Instead of look at invoice's date process should look at payment's date
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0054889)
hgbot (developer)
2012-12-12 13:33

Repository: erp/devel/pi
Changeset: b8adf9e3f452aa1afa2841b173eed351b67b7e87
Author: Ioritz Cia <ioritz.cia <at> openbravo.com>
Date: Tue Dec 11 12:22:35 2012 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/b8adf9e3f452aa1afa2841b173eed351b67b7e87 [^]

Fixes issue 21980: 'Fully paid documents' Commissions.
Commission defined as Basis Status 'Fully Paid Documents' should consider payment date (instead of document date).

---
M src-db/database/model/functions/C_COMMISSION_PROCESS.xml
---
(0054920)
maite (developer)
2012-12-13 17:08

verified
(0054992)
hudsonbot (developer)
2012-12-17 13:33

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/c79ef1b1f830 [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2012-10-17 18:15 maite New Issue
2012-10-17 18:15 maite Assigned To => dmiguelez
2012-10-17 18:15 maite Modules => Core
2012-10-17 18:15 maite Issue Monitored: networkb
2012-10-17 18:23 dmiguelez Assigned To dmiguelez => jonalegriaesarte
2012-10-20 08:46 jonalegriaesarte Assigned To jonalegriaesarte => ioritzCia
2012-11-02 14:52 ioritzCia Target Version 3.0MP17 => 3.0MP18
2012-12-04 11:47 jonalegriaesarte Target Version 3.0MP18 => 3.0MP19
2012-12-12 13:33 hgbot Checkin
2012-12-12 13:33 hgbot Note Added: 0054889
2012-12-12 13:33 hgbot Status new => resolved
2012-12-12 13:33 hgbot Resolution open => fixed
2012-12-12 13:33 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/b8adf9e3f452aa1afa2841b173eed351b67b7e87 [^]
2012-12-13 17:08 maite Note Added: 0054920
2012-12-13 17:08 maite Status resolved => closed
2012-12-17 13:33 hudsonbot Checkin
2012-12-17 13:33 hudsonbot Note Added: 0054992


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker