Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0019772
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Openbravo ERP] 05. Production managementminoralways2012-02-15 09:412012-02-19 15:24
ReporterVictorVillarView Statuspublic 
Assigned ToVictorVillar 
PriorityhighResolutionopenFixed in Version
StatusnewFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version3.0MP7.1SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0019772: More information should be fine when the user selects the WR phase in Production run tab

DescriptionWhen the user navigates to Work effort window || production run tab, and selects the Work requirement phase, it should be fine to have more information in order to validate or confirm that the work requirement picked is the correct one that the user needs.
Steps To ReproduceSet a process plan and a work requirement before the steps below
As group admin role,

Go to Work effor window,
Create a new register
 Navigate to Production run tab:
     create a new register and in the WR phase drop down list we can see the WR No., the date, the activity and the phase line.
Proposed SolutionIt should be fine to have more information, for instance the name of the process plan or the name of the finished product in an additional field or in the same selector. Then it should not necessary to double check in the work requirement window or in the products tab below the production run to make sure the correct
product is chosen.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2012-02-15 09:41 VictorVillar New Issue
2012-02-15 09:41 VictorVillar Assigned To => jonalegriaesarte
2012-02-15 09:41 VictorVillar Modules => Core
2012-02-15 09:42 VictorVillar Issue Monitored: networkb
2012-02-15 09:58 VictorVillar Assigned To jonalegriaesarte => VictorVillar
2012-02-19 15:24 mensenjh Issue Monitored: mensenjh


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker