Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0019623
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 06. Material requirement planning (MRP)minoralways2012-02-02 11:152012-03-02 15:35
ReporterjonalegriaesarteView Statuspublic 
Assigned Toumartirena 
PrioritynormalResolutionfixedFixed in Version3.0MP9
StatusclosedFix in branchFixed in SCM revisiona6b8811f3217
ProjectionnoneETAnoneTarget Version3.0MP9
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product VersionpiSCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0019623: MRP: Sales Forecast should be renamed to Planning or MRP Forecast

DescriptionSales Forecast is incorrect, this forecast is not for Sales but for MRP purposes only
Steps To ReproduceName should be updated
Proposed SolutionRename to either 'Planning Forecast' or 'MRP Forecast'
TagsOB3 Documentation
Attached Files

- Relationships Relation Graph ] Dependency Graph ]
related to defect 0005317 closednaiaramartinez MRP: Sales Forecast should be renamed to Production Forecast 

-  Notes
(0044795)
RenateNieuwkoop (reporter)
2012-02-02 11:51

Since the Sales Forecast is used both in the Manufacturing Plan and the Purchasing plan of MRP, I suggest a more general name that suggested before (before the name Manufacturing forecast was suggested, but would not cover the use in the Purchasing Plan):

'Planning Forecast' or 'MRP Forecast'

cheers
Renate
(0044946)
hgbot (developer)
2012-02-09 09:51

Repository: erp/devel/pi
Changeset: a6b8811f3217c215023d355d78e464a9db6e8df8
Author: Unai Martirena <unai.martirena <at> openbravo.com>
Date: Thu Feb 09 09:50:00 2012 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/a6b8811f3217c215023d355d78e464a9db6e8df8 [^]

Fixes Issue 0019623: Sales Forecast should be renamed, Planning or MRP Forecast

---
M src-db/database/sourcedata/AD_MENU.xml
M src-db/database/sourcedata/AD_TAB.xml
M src-db/database/sourcedata/AD_WINDOW.xml
---
(0045634)
jonalegriaesarte (reporter)
2012-02-29 18:24

Verified
(0045779)
hudsonbot (developer)
2012-03-02 15:35

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/544d64e0c159 [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2012-02-02 11:15 jonalegriaesarte New Issue
2012-02-02 11:15 jonalegriaesarte Assigned To => jonalegriaesarte
2012-02-02 11:15 jonalegriaesarte Modules => Core
2012-02-02 11:15 jonalegriaesarte Relationship added related to 0005317
2012-02-02 11:16 jonalegriaesarte Tag Attached: OB3 Documentation
2012-02-02 11:51 RenateNieuwkoop Note Added: 0044795
2012-02-02 11:52 RenateNieuwkoop Summary MRP: Sales Forecast should be renamed to Production Forecast => MRP: Sales Forecast should be renamed to Planning or MRP Forecast
2012-02-02 11:53 RenateNieuwkoop Description Updated View Revisions
2012-02-02 11:53 RenateNieuwkoop Steps to Reproduce Updated View Revisions
2012-02-02 11:53 RenateNieuwkoop Proposed Solution updated
2012-02-02 11:54 RenateNieuwkoop Issue Monitored: RenateNieuwkoop
2012-02-02 18:39 jonalegriaesarte Assigned To jonalegriaesarte => umartirena
2012-02-09 09:51 hgbot Checkin
2012-02-09 09:51 hgbot Note Added: 0044946
2012-02-09 09:51 hgbot Status new => resolved
2012-02-09 09:51 hgbot Resolution open => fixed
2012-02-09 09:51 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/a6b8811f3217c215023d355d78e464a9db6e8df8 [^]
2012-02-29 18:24 jonalegriaesarte Note Added: 0045634
2012-02-29 18:24 jonalegriaesarte Status resolved => closed
2012-02-29 18:24 jonalegriaesarte Fixed in Version => 3.0MP9
2012-03-02 15:35 hudsonbot Checkin
2012-03-02 15:35 hudsonbot Note Added: 0045779


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker