Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0019599
TypeCategorySeverityReproducibilityDate SubmittedLast Update
defect[Openbravo ERP] 05. Production managementminoralways2012-01-31 10:522012-04-02 06:10
ReporterVictorVillarView Statuspublic 
Assigned Tojecharri 
PriorityhighResolutionfixedFixed in Version
StatusclosedFix in branchFixed in SCM revision4d25dd8fed86
ProjectionnoneETAnoneTarget Version3.0MP10
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version3.0MP7.1SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0019599: Wrong assignment of process plan to a Copy product in Process plan window

DescriptionWhen the user creates a process plan, with a sequence with P- product with a process plan assigned by default, and then he has create an intermediate product using Copy Product button in the process plan, the system copies the process plan field into the new product. This is not correct, because in this case, we will be assuming that both the P- (the origin of the copy) and the P+ (the result of the copy) are manufactured by the same process plan.
Steps To ReproduceSet before a process plan, name: prueba, two products as production: Ale Beer and Apple Juice and an Activity
As group Admin role,
go to Product window:
 select Ale beer product
       Assign the process plan prueba to this product
Go to process plan window:
     create a new sequence: name: S2
                            create standars: yes
   go to I/O products tab:
      create a new one: product: Ale beer, Production type: P-, quantity: 1
click in Create Product Copy button,
        name: Ale beer without alcohol
        production type: P+
        quantity: 2
        Copy attributes in production process: Yes
Go to product window:
    select Ale beer without alcohol product
We can see the process plan assigned to this intermediate product, this is wrong.
Proposed Solutionthe best solution would be left in blank the process plan assigned to this new product, and the the user assigned one if he wants to.
TagsNo tags attached.
Attached Files

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0046480)
hgbot (developer)
2012-03-15 18:55

Repository: erp/devel/pi
Changeset: 4d25dd8fed868592b6d14455b476a4fbb6ac8ee2
Author: Javier Etxarri <javier.echarri <at> openbravo.com>
Date: Thu Mar 15 18:55:07 2012 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/4d25dd8fed868592b6d14455b476a4fbb6ac8ee2 [^]

Fixes issue 19599: Wrong assignment of process plan to a Copy product in Process plan window

---
M src/org/openbravo/erpCommon/ad_actionButton/SequenceProductCreate.java
---
(0046489)
jecharri (developer)
2012-03-16 09:07

Test cases:
-with steps to reproduce is enough
(0046870)
VictorVillar (developer)
2012-03-29 11:53

Verified
(0047153)
hudsonbot (developer)
2012-04-02 06:10

A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/7814864461ac [^]

Maturity status: Test

- Issue History
Date Modified Username Field Change
2012-01-31 10:52 VictorVillar New Issue
2012-01-31 10:52 VictorVillar Assigned To => jonalegriaesarte
2012-01-31 10:52 VictorVillar Modules => Core
2012-01-31 10:52 VictorVillar Resolution time => 1334008800
2012-01-31 10:52 VictorVillar Issue Monitored: networkb
2012-03-06 12:47 jonalegriaesarte Assigned To jonalegriaesarte => jecharri
2012-03-15 18:55 hgbot Checkin
2012-03-15 18:55 hgbot Note Added: 0046480
2012-03-15 18:55 hgbot Status new => resolved
2012-03-15 18:55 hgbot Resolution open => fixed
2012-03-15 18:55 hgbot Fixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/4d25dd8fed868592b6d14455b476a4fbb6ac8ee2 [^]
2012-03-16 09:07 jecharri Note Added: 0046489
2012-03-29 11:53 VictorVillar Note Added: 0046870
2012-03-29 11:53 VictorVillar Status resolved => closed
2012-04-02 06:10 hudsonbot Checkin
2012-04-02 06:10 hudsonbot Note Added: 0047153


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker