Project:
View Issue Details[ Jump to Notes ] | [ Issue History ] [ Print ] | |||||||||||
ID | ||||||||||||
0010611 | ||||||||||||
Type | Category | Severity | Reproducibility | Date Submitted | Last Update | |||||||
feature request | [Openbravo ERP] 06. Material requirement planning (MRP) | minor | have not tried | 2009-09-15 13:00 | 2011-02-04 09:11 | |||||||
Reporter | RenateNieuwkoop | View Status | public | |||||||||
Assigned To | rmorley | |||||||||||
Priority | normal | Resolution | open | Fixed in Version | ||||||||
Status | feedback | Fix in branch | Fixed in SCM revision | |||||||||
Projection | none | ETA | none | Target Version | ||||||||
OS | Any | Database | Any | Java version | ||||||||
OS Version | Database version | Ant version | ||||||||||
Product Version | 2.50MP5 | SCM revision | ||||||||||
Review Assigned To | ||||||||||||
Web browser | ||||||||||||
Modules | Core | |||||||||||
Regression level | ||||||||||||
Regression date | ||||||||||||
Regression introduced in release | ||||||||||||
Regression introduced by commit | ||||||||||||
Triggers an Emergency Pack | No | |||||||||||
Summary | 0010611: RFE: MRP needs to take the Convesion Rate of the Process Plan into account when suggestion Work Requirements | |||||||||||
Description | Production Management || Transactions || Process Plan || Process Plan The process plan for a product contains a Conversion Rate However, the MRP outcome of the Manufacturing plan doesn't take into account this conversion rate, so in the end the Quantity on the Work requirement might be something like '206.251' (see snapshot). | |||||||||||
Steps To Reproduce | Setup a process plan with a Conversion rate of 8 for example. Then create demand for the part and run the Manafacturing Plan. For a more detailed case, please check the Production (openbravo badges) and MRP modules (mfg plan) of the BFT that was provided to Paolo for use within development group. | |||||||||||
Proposed Solution | MRP should take conversion rates of the product into account (or have at least an option to set it up in that way) | |||||||||||
Tags | No tags attached. | |||||||||||
Attached Files | 150909ConversionRate.jpg [^] (186,357 bytes) 2009-09-15 13:00
| |||||||||||
Relationships [ Relation Graph ] [ Dependency Graph ] | |
Notes | |
(0020072) rafaroda (developer) 2009-09-15 13:29 |
Renate, These steps to reproduce are not enough. Please take these as an example http://wiki.openbravo.com/wiki/How-to_MRP#MRP:_A_second_example [^] Thanks. |
Issue History | |||
Date Modified | Username | Field | Change |
2009-09-15 13:00 | RenateNieuwkoop | New Issue | |
2009-09-15 13:00 | RenateNieuwkoop | Assigned To | => rafaroda |
2009-09-15 13:00 | RenateNieuwkoop | File Added: 150909ConversionRate.jpg | |
2009-09-15 13:29 | rafaroda | Note Added: 0020072 | |
2009-09-15 13:29 | rafaroda | Status | new => feedback |
2009-09-18 07:08 | rafaroda | Assigned To | rafaroda => pjuvara |
2011-02-04 09:11 | jpabloae | Assigned To | pjuvara => rmorley |
Copyright © 2000 - 2009 MantisBT Group |