Anonymous | Login
Project:
RSS
  
News | My View | View Issues | Roadmap | Summary

View Issue DetailsJump to Notes ] Issue History ] Print ]
ID
0010611
TypeCategorySeverityReproducibilityDate SubmittedLast Update
feature request[Openbravo ERP] 06. Material requirement planning (MRP)minorhave not tried2009-09-15 13:002011-02-04 09:11
ReporterRenateNieuwkoopView Statuspublic 
Assigned Tormorley 
PrioritynormalResolutionopenFixed in Version
StatusfeedbackFix in branchFixed in SCM revision
ProjectionnoneETAnoneTarget Version
OSAnyDatabaseAnyJava version
OS VersionDatabase versionAnt version
Product Version2.50MP5SCM revision 
Review Assigned To
Web browser
ModulesCore
Regression level
Regression date
Regression introduced in release
Regression introduced by commit
Triggers an Emergency PackNo
Summary

0010611: RFE: MRP needs to take the Convesion Rate of the Process Plan into account when suggestion Work Requirements

DescriptionProduction Management || Transactions || Process Plan || Process Plan

The process plan for a product contains a Conversion Rate
However, the MRP outcome of the Manufacturing plan doesn't take into account this conversion rate, so in the end the Quantity on the Work requirement might be something like '206.251' (see snapshot).
Steps To ReproduceSetup a process plan with a Conversion rate of 8 for example. Then create demand for the part and run the Manafacturing Plan.
For a more detailed case, please check the Production (openbravo badges) and MRP modules (mfg plan) of the BFT that was provided to Paolo for use within development group.
Proposed SolutionMRP should take conversion rates of the product into account (or have at least an option to set it up in that way)
TagsNo tags attached.
Attached Filesjpg file icon 150909ConversionRate.jpg [^] (186,357 bytes) 2009-09-15 13:00

- Relationships Relation Graph ] Dependency Graph ]

-  Notes
(0020072)
rafaroda (developer)
2009-09-15 13:29

Renate,

These steps to reproduce are not enough. Please take these as an example http://wiki.openbravo.com/wiki/How-to_MRP#MRP:_A_second_example [^]

Thanks.

- Issue History
Date Modified Username Field Change
2009-09-15 13:00 RenateNieuwkoop New Issue
2009-09-15 13:00 RenateNieuwkoop Assigned To => rafaroda
2009-09-15 13:00 RenateNieuwkoop File Added: 150909ConversionRate.jpg
2009-09-15 13:29 rafaroda Note Added: 0020072
2009-09-15 13:29 rafaroda Status new => feedback
2009-09-18 07:08 rafaroda Assigned To rafaroda => pjuvara
2011-02-04 09:11 jpabloae Assigned To pjuvara => rmorley


Copyright © 2000 - 2009 MantisBT Group
Powered by Mantis Bugtracker